Winchester Peerless Rachel Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Self-rescue devices; use and location requirements.
30 CFR 75.1714-2(c) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · $151.00 proposed penalty
Storage of materials.
30 CFR 77.208(d) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $226.00 proposed penalty
Ventilation controls.
30 CFR 75.333(b)(3) · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $226.00 proposed penalty
Spot Inspections
103(i) · 10.0 on-site hours reported
Low- and medium-voltage ground check monitor circuits.
30 CFR 75.902 · $151.00 proposed penalty
Low- and medium-voltage ground check monitor circuits.
30 CFR 75.902 · $151.00 proposed penalty
Low- and medium-voltage ground check monitor circuits.
30 CFR 75.902 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $165.00 proposed penalty
Roof bolting.
30 CFR 75.204(g) · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $193.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $432.00 proposed penalty
On-shift examination.
30 CFR 75.362(a)(1) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $17,082.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Water sprinkler systems; arrangement of sprinklers.
30 CFR 75.1101-8(a) · $1,037.00 proposed penalty
Temporary notations, revisions, and supplements.
30 CFR 75.1202 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.