← Winchester Peerless Rachel Mine

Winchester Peerless Rachel Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 9849118

    30 CFR 75.512 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 9849117

    30 CFR 75.512 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  3. Escapeways; bituminous and lignite mines.

    violationRecord 9849116

    30 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord 6320439

    474.8 on-site hours reported

  5. Spot Inspection

    inspectionRecord 6321483

    4.0 on-site hours reported

  6. Spot Inspections

    inspectionRecord 6321593

    103(i) · 5.5 on-site hours reported

  7. Spot Inspection

    inspectionRecord 6320134

    4.5 on-site hours reported

  8. Maintenance of incombustible content of rock dust.

    violationRecord 9848514

    30 CFR 75.403 · $226.00 proposed penalty

  9. Maintenance of incombustible content of rock dust.

    violationRecord 9848513

    30 CFR 75.403 · $226.00 proposed penalty

  10. Underground diesel fuel tanks and safety cans.

    violationRecord 9848512

    30 CFR 75.1904(c) · $151.00 proposed penalty

  11. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9848511

    30 CFR 75.1909(c)(5) · $818.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 9848510

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  13. Maintenance of incombustible content of rock dust.

    violationRecord 9849005

    30 CFR 75.403 · $226.00 proposed penalty

  14. Ventilation controls.

    violationRecord 9849004

    30 CFR 75.333(d)(2) · $209.00 proposed penalty

  15. Permissible electric face equipment; maintenance.

    violationRecord 9849003

    30 CFR 75.503 · $504.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 9848509

    30 CFR 75.400 · $177.00 proposed penalty

  17. Electrical Technical Investigation

    inspectionRecord 6321880

    5.0 on-site hours reported

  18. Ventilation controls.

    violationRecord 9849002

    30 CFR 75.333(d)(2) · $151.00 proposed penalty

  19. Machinery and equipment; operation and maintenance.

    violationRecord 9848508

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  20. Spot Inspections

    inspectionRecord 6322543

    103(i) · 6.0 on-site hours reported

  21. Accumulation of combustible materials.

    violationRecord 9848507

    30 CFR 75.400 · $177.00 proposed penalty

  22. Clamping of trailing cables to equipment.

    violationRecord 9848506

    30 CFR 75.605 · $209.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 9849001

    30 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  24. Hand-held power tools; safety devices.

    violationRecord 9849612

    30 CFR 75.1724 · $151.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 9849611

    30 CFR 75.400 · $177.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.