Winchester 2 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Weekly examination.
30 CFR 75.364(b)(2) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $209.00 proposed penalty
Air quality.
30 CFR 75.321(a)(1) · Significant and substantial (S&S) · $697.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $366.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
30 CFR 75.1107-7(b) · $151.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
30 CFR 75.1107-4(c) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $177.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $642.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $642.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
200.5 on-site hours reported
Proximity detection systems.
30 CFR 75.1732(d)(1) · $245.00 proposed penalty
Atmospheric monitoring systems.
30 CFR 75.351(n)(3)(i) · $642.00 proposed penalty
Respirable dust standards.
30 CFR 70.100(a)(2) · Significant and substantial (S&S) · $549.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $549.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · Significant and substantial (S&S) · $592.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $549.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Other safeguards.
30 CFR 75.1403
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.