West Spring Energy safety activity
MSHA violations, accident reports and inspections.
Safety activity
Compliance Follow-up Inspection
0.0 on-site hours reported
Mine Idle Activity
20.0 on-site hours reported
Transfer; notice.
30 CFR 90.102(c)
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $151.00 proposed penalty
Regular Safety and Health Inspection
25.0 on-site hours reported
Quantity and location of firefighting equipment.
30 CFR 77.1109(a) · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Regular Safety and Health Inspection
33.0 on-site hours reported
Spot Inspection
6.0 on-site hours reported
Handling of materials
Days away from work only
Accident narrative
Drill rig was tracking w/tower down when drill steels fell out of top of carousel. Employee was trying to put steels back in carousel using a truck crane and come -a long when a drill steel shifted pinching EE's hand and fingers between 2 drill steels.
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · Significant and substantial (S&S) · $226.00 proposed penalty
Regular Safety and Health Inspection
47.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.