← Warriormine No. 13

Warriormine No. 13 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Waiver of surface facilities requirements; posting of waiver.

    violationRecord 5132078

    30 CFR 71.403(c) · $151.00 proposed penalty

  2. Requirement for an MSDS.

    violationRecord 5132077

    30 CFR 47.51 · $151.00 proposed penalty

  3. Training.

    violationRecord 5132076

    30 CFR 62.180(b) · $151.00 proposed penalty

  4. Periodic examinations.

    violationRecord 5132075

    30 CFR 72.100(e) · $151.00 proposed penalty

  5. Insulating mats at power switches.

    violationRecord 5132069

    30 CFR 77.513 · $151.00 proposed penalty

  6. Examination and maintenance of firefighting equipment.

    violationRecord 5132068

    30 CFR 77.1110 · $151.00 proposed penalty

  7. Loading and haulage equipment; installations.

    violationRecord 5132067

    30 CFR 77.1605(d) · $151.00 proposed penalty

  8. Regular Safety and Health Inspection

    inspectionRecord 7047948

    24.0 on-site hours reported

  9. Spot Inspection

    inspectionRecord F020DB2

    10.5 on-site hours reported

  10. Roof control plan.

    violationRecord 5099388

    30 CFR 75.220(a)(1) · $165.00 proposed penalty

  11. Cable fittings; suitability.

    violationRecord 5099387

    30 CFR 75.515 · $151.00 proposed penalty

  12. Proximity detection systems.

    violationRecord 5099386

    30 CFR 75.1732(b)(6) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  13. Proximity detection systems.

    violationRecord 5099385

    30 CFR 75.1732(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  14. Health Technical Investigation

    inspectionRecord F02EE08

    0.5 on-site hours reported

  15. Health Technical Investigation

    inspectionRecord F02EE07

    6.3 on-site hours reported

  16. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 5131404

    30 CFR 75.1712-3(a) · $151.00 proposed penalty

  17. Regular Safety and Health Inspection

    inspectionRecord F02EB99

    4.5 on-site hours reported

  18. Machinery and equipment; operation and maintenance.

    violationRecord 5131047

    30 CFR 77.404(a) · Significant and substantial (S&S) · $336.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord F013A14

    5.5 on-site hours reported

  20. Electric equipment; examination, testing, and maintenance.

    violationRecord 5132102

    30 CFR 77.502 · $151.00 proposed penalty

  21. Electrical Technical Investigation

    inspectionRecord F010DE0

    20.5 on-site hours reported

  22. Regular Safety and Health Inspection

    inspectionRecord F020A4D

    16.8 on-site hours reported

  23. Regular Safety and Health Inspection

    inspectionRecord 7049067

    4.0 on-site hours reported

  24. Regular Safety and Health Inspection

    inspectionRecord F00855A

    5.0 on-site hours reported

  25. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9839723

    30 CFR 77.1606(c) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.