← VINEYARD ROCK

VINEYARD ROCK safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Scaffolds and working platforms.

    violationRecord 5162465

    30 CFR 56.11027 · $288.00 proposed penalty

  2. Roll-over protective structures (ROPS) and seat belts.

    violationRecord 5162464

    30 CFR 56.14130(g) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  3. Inspection.

    violationRecord 5162463

    30 CFR 56.4201(a)(2) · $193.00 proposed penalty

  4. Berms or guardrails.

    violationRecord 5162462

    30 CFR 56.9300 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  5. Berms or guardrails.

    violationRecord 5162461

    30 CFR 56.9300(a) · $288.00 proposed penalty

  6. Changes; notification by operator.

    violationRecord 5162460

    30 CFR 41.12 · $151.00 proposed penalty

  7. Regular Safety and Health Inspection

    inspectionRecord F034D6E

    17.8 on-site hours reported

  8. Compliance Follow-up Inspection

    inspectionRecord F012E2C

    4.8 on-site hours reported

  9. Brakes.

    violationRecord 5100916

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  10. Inspection of compressed-air receivers and other unfired pressure vessels.

    violationRecord 5100915

    30 CFR 56.13015(a) · $151.00 proposed penalty

  11. Inspection of compressed-air receivers and other unfired pressure vessels.

    violationRecord 5100914

    30 CFR 56.13015(a) · $151.00 proposed penalty

  12. Verbal Hazard Complaint Inspections

    inspectionRecord F025DB3

    6.0 on-site hours reported

  13. Records of training.

    violationRecord 5100907

    30 CFR 46.9(c)(3) · $151.00 proposed penalty

  14. Newly hired experienced miner training.

    violationRecord 5100906

    30 CFR 46.6(a) · Significant and substantial (S&S) · $184.00 proposed penalty

  15. Berms or guardrails.

    violationRecord 9308399

    30 CFR 56.9300(b) · $151.00 proposed penalty

  16. Scaffolds and working platforms.

    violationRecord 9308398

    30 CFR 56.11027 · Significant and substantial (S&S) · $165.00 proposed penalty

  17. Parking procedures for unattended equipment.

    violationRecord 9308397

    30 CFR 56.14207 · $151.00 proposed penalty

  18. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5100905

    30 CFR 50.30(a) · $151.00 proposed penalty

  19. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5100904

    30 CFR 50.30(a) · $151.00 proposed penalty

  20. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5100903

    30 CFR 50.30(a) · $151.00 proposed penalty

  21. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5100902

    30 CFR 50.30(a) · $151.00 proposed penalty

  22. Annual refresher training.

    violationRecord 5100901

    30 CFR 46.8(a)(2) · Significant and substantial (S&S) · $407.00 proposed penalty

  23. Regular Safety and Health Inspection

    inspectionRecord F025DB1

    12.8 on-site hours reported

  24. Regular Safety and Health Inspection

    inspectionRecord F02786C

    1.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.