← Viburnum #35 (Casteel Mine)

Viburnum #35 (Casteel Mine) safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Immediate notification.

    violationRecord 9763274

    30 CFR 50.10(d) · Significant and substantial (S&S) · $3,263.00 proposed penalty

  2. Housekeeping.

    violationRecord 9763273

    30 CFR 57.20003 · Significant and substantial (S&S) · $7,267.00 proposed penalty

  3. Procedures for inspection, testing, and maintenance.

    violationRecord 9763272

    30 CFR 57.19120 · Significant and substantial (S&S) · $28,316.00 proposed penalty

  4. Violation — cited standard not reported

    violationRecord 5043017
  5. Non-Injury Accident Investigation

    inspectionRecord F0147FF

    110.3 on-site hours reported

  6. Housekeeping.

    violationRecord 5043016

    30 CFR 57.20003(c) · $151.00 proposed penalty

  7. Protection of power conductors from mobile equipment.

    violationRecord 9763271

    30 CFR 57.12005 · $151.00 proposed penalty

  8. Escape routes.

    violationRecord 5043015

    30 CFR 57.11051(b) · $151.00 proposed penalty

  9. Handtools (nonpowered)

    accidentRecord 220252390009

    Days restricted activity only

    Accident narrative

    EMPLOYEE WAS USING A COME-A-LONG TO PULL A DENT OUT OF A FENDER TO ATTACH A HANDRAIL, WHEN THE COME-A-LONG SLIPPED OFF AND STRUCK THE EMPLOYEE ON THE LEFT SIDE OF THE HEAD.

  10. Circuit overload protection.

    violationRecord 9763270

    30 CFR 57.12001 · $177.00 proposed penalty

  11. Machinery, equipment, and tools.

    violationRecord 5043014

    30 CFR 57.14205 · Significant and substantial (S&S) · $883.00 proposed penalty

  12. Protection for openings around travelways.

    violationRecord 5043013

    30 CFR 57.11012 · $177.00 proposed penalty

  13. Insulation and fittings for power wires and cables.

    violationRecord 5043012

    30 CFR 57.12008 · $398.00 proposed penalty

  14. Testing grounding systems.

    violationRecord 5040341

    30 CFR 57.12028 · $151.00 proposed penalty

  15. Insulation and fittings for power wires and cables.

    violationRecord 9763269

    30 CFR 57.12008 · $177.00 proposed penalty

  16. Inspection and cover plates.

    violationRecord 9763268

    30 CFR 57.12032 · $267.00 proposed penalty

  17. Insulation and fittings for power wires and cables.

    violationRecord 9763267

    30 CFR 57.12008 · $177.00 proposed penalty

  18. Circuit overload protection.

    violationRecord 9763266

    30 CFR 57.12001 · $177.00 proposed penalty

  19. Inspection.

    violationRecord 5043011

    30 CFR 57.4201 · $151.00 proposed penalty

  20. Controls and switches.

    violationRecord 5043010

    30 CFR 57.12002 · $398.00 proposed penalty

  21. Escapeways and refuges.

    violationRecord 5043009

    30 CFR 57.11050(a) · $151.00 proposed penalty

  22. Berms or guardrails.

    violationRecord 5043008

    30 CFR 57.9300(b) · Significant and substantial (S&S) · $883.00 proposed penalty

  23. Electrical conductors.

    violationRecord 9760531

    30 CFR 57.12004 · $151.00 proposed penalty

  24. General requirements.

    violationRecord 9760530

    30 CFR 57.4200(b)(2) · $151.00 proposed penalty

  25. Housekeeping.

    violationRecord 9760529

    30 CFR 57.20003(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.