Controls and switches.
30 CFR 57.12002 · $1,320.00 proposed penalty
Controls and switches.
30 CFR 57.12002 · $1,320.00 proposed penalty
Controls and switches.
30 CFR 57.12002 · $1,320.00 proposed penalty
Construction and maintenance of guards.
30 CFR 57.14112(b) · Significant and substantial (S&S) · $883.00 proposed penalty
General requirements.
30 CFR 57.4200(b)(2) · $151.00 proposed penalty
Construction and maintenance of guards.
30 CFR 57.14112(b) · $177.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $177.00 proposed penalty
Warning signs.
30 CFR 57.4101 · $177.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $165.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $165.00 proposed penalty
Shaft landing gates.
30 CFR 57.19100 · $177.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Ground support use.
30 CFR 57.3360 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Inspection and cover plates.
30 CFR 57.12032 · $398.00 proposed penalty
First aid materials.
30 CFR 57.15001 · $151.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $151.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(1) · $177.00 proposed penalty
Explosive material storage practices.
30 CFR 57.6102(a)(2) · $177.00 proposed penalty
Main facilities.
30 CFR 57.6160(b)(3) · $398.00 proposed penalty
Damaged or deteriorated explosive material.
30 CFR 57.6900 · $1,320.00 proposed penalty
Spot Inspection
3.5 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $267.00 proposed penalty
Inspection and cover plates.
30 CFR 57.12032 · $177.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $398.00 proposed penalty
Guarding around lights.
30 CFR 57.12034 · $177.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.