Viburnum #35 (Casteel Mine) safety activity
MSHA violations, accident reports and inspections.
Safety activity
Training for mine rescue teams.
30 CFR 49.8(a) · $6,540.00 proposed penalty
Training for mine rescue teams.
30 CFR 49.8(g) · $151.00 proposed penalty
Underground evacuation drills.
30 CFR 57.4361(a) · $465.00 proposed penalty
Shaft mines.
30 CFR 57.4760 · $465.00 proposed penalty
Escape and evacuation plans.
30 CFR 57.11053 · $151.00 proposed penalty
Ventilation plan.
30 CFR 57.8520 · $151.00 proposed penalty
Check-in, check-out system.
30 CFR 57.11058 · $151.00 proposed penalty
Underground evacuation drills.
30 CFR 57.4361(c) · $151.00 proposed penalty
Moving machine parts.
30 CFR 57.14107(a) · $209.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(c) · $465.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $177.00 proposed penalty
Portable rigid ladders.
30 CFR 57.11004 · Significant and substantial (S&S) · $697.00 proposed penalty
Surface fan installations and mine openings.
30 CFR 57.4131(a) · $151.00 proposed penalty
Unguarded conveyors with adjacent travelways.
30 CFR 57.14109(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $177.00 proposed penalty
Inspection.
30 CFR 57.4201 · $151.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $398.00 proposed penalty
Escapeways and refuges.
30 CFR 57.11050(a) · $151.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $151.00 proposed penalty
Escapeways and refuges.
30 CFR 57.11050(a) · $151.00 proposed penalty
Handling of misfires.
30 CFR 57.6311 · $151.00 proposed penalty
Berms or guardrails.
30 CFR 57.9300(a) · $465.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.