← USMC Ione Plant

USMC Ione Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Safe access.

    violationRecord 5105167

    30 CFR 56.11001 · $366.00 proposed penalty

  2. Air receiver tanks.

    violationRecord 5105166

    30 CFR 56.13011 · $1,219.00 proposed penalty

  3. Moving machine parts.

    violationRecord 5105165

    30 CFR 56.14107(a) · $1,679.00 proposed penalty

  4. Safety belts and lines.

    violationRecord 5105164

    30 CFR 56.15005 · $366.00 proposed penalty

  5. Construction and maintenance of guards.

    violationRecord 5105163

    30 CFR 56.14112(b) · $366.00 proposed penalty

  6. Safety defects; examination, correction and records.

    violationRecord 5105162

    30 CFR 56.14100(b) · $366.00 proposed penalty

  7. Retaining dams.

    violationRecord 9890349

    30 CFR 56.20010 · $165.00 proposed penalty

  8. Moving machine parts.

    violationRecord 5105161

    30 CFR 56.14107 · $366.00 proposed penalty

  9. General requirements for boilers and pressure vessels.

    violationRecord 5105160

    30 CFR 56.13001 · $366.00 proposed penalty

  10. Requirement for an MSDS.

    violationRecord 5105159

    30 CFR 47.51 · $366.00 proposed penalty

  11. Storage of incompatible substances.

    violationRecord 5105158

    30 CFR 56.16012 · $366.00 proposed penalty

  12. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F022F48

    2.0 on-site hours reported

  13. Handrails and toeboards.

    violationRecord 5105157

    30 CFR 56.11002 · $1,219.00 proposed penalty

  14. Fixed ladder landings.

    violationRecord 5105156

    30 CFR 56.11006 · $366.00 proposed penalty

  15. Electrical conductors.

    violationRecord 5105155

    30 CFR 56.12004 · $1,550.00 proposed penalty

  16. Moving machine parts.

    violationRecord 5105154

    30 CFR 56.14107(a) · $1,679.00 proposed penalty

  17. Moving machine parts.

    violationRecord 5105153

    30 CFR 56.14107(a) · $1,679.00 proposed penalty

  18. Grounding circuit enclosures.

    violationRecord 5105152

    30 CFR 56.12025 · $1,219.00 proposed penalty

  19. Construction and maintenance of guards.

    violationRecord 5105151

    30 CFR 56.14112(a) · $366.00 proposed penalty

  20. Construction and maintenance of guards.

    violationRecord 5105150

    30 CFR 56.14112(b) · $366.00 proposed penalty

  21. Controls and switches.

    violationRecord 5105149

    30 CFR 56.12002 · $366.00 proposed penalty

  22. Conveyor start-up warnings.

    violationRecord 5105148

    30 CFR 56.14201(b) · $366.00 proposed penalty

  23. Construction and maintenance of guards.

    violationRecord 5105147

    30 CFR 56.14112(b) · $366.00 proposed penalty

  24. Handrails and toeboards.

    violationRecord 5105146

    30 CFR 56.11002 · $366.00 proposed penalty

  25. Identification of power switches.

    violationRecord 5105145

    30 CFR 56.12018 · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.