← UNION BRIDGE MD

UNION BRIDGE MD safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Procedures during repairs or maintenance.

    violationRecord 5079754

    30 CFR 56.14105 · Significant and substantial (S&S)

  2. Non-Fatal Accident Investigation

    inspectionRecord F04BBB4

    2.3 on-site hours reported

  3. Electrical

    accidentRecord 220262600015

    Days away from work only

    Accident narrative

    Employee was removing an electrical meter when there was an Arc. Employee was shocked with current going in one hand running thru chest and out other hand.

  4. Compliance Follow-up Inspection

    inspectionRecord F044D80

    3.0 on-site hours reported

  5. Compliance Follow-up Inspection

    inspectionRecord F042B38

    1.0 on-site hours reported

  6. Compliance Follow-up Inspection

    inspectionRecord F044D7E

    0.0 on-site hours reported

  7. Inspection and cover plates.

    violationRecord 5075675

    30 CFR 56.12032 · $465.00 proposed penalty

  8. Moving machine parts.

    violationRecord 5075674

    30 CFR 56.14107(a) · $151.00 proposed penalty

  9. Securing gas cylinders.

    violationRecord 5075673

    30 CFR 56.16005 · $177.00 proposed penalty

  10. Procedures during repairs or maintenance.

    violationRecord 5075672

    30 CFR 56.14105 · Significant and substantial (S&S) · $818.00 proposed penalty

  11. Procedures during repairs or maintenance.

    violationRecord 5075671

    30 CFR 56.14105 · Significant and substantial (S&S) · $697.00 proposed penalty

  12. Procedures during repairs or maintenance.

    violationRecord 5075670

    30 CFR 56.14105 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  13. Housekeeping.

    violationRecord 5075669

    30 CFR 56.20003(a) · $177.00 proposed penalty

  14. Housekeeping.

    violationRecord 5075668

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $883.00 proposed penalty

  15. Securing gas cylinders.

    violationRecord 5075667

    30 CFR 56.16005 · $151.00 proposed penalty

  16. Safe access.

    violationRecord 5075666

    30 CFR 56.11001 · $504.00 proposed penalty

  17. Inspection and cover plates.

    violationRecord 5079719

    30 CFR 56.12032 · $592.00 proposed penalty

  18. Written safety program.

    violationRecord 5079718

    30 CFR 56.23002(a) · $151.00 proposed penalty

  19. Bins, hoppers, silos, tanks, and surge piles.

    violationRecord 5079717

    30 CFR 56.16002(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  20. Written safety program.

    violationRecord 5079716

    30 CFR 56.23002(a) · $151.00 proposed penalty

  21. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5079715

    30 CFR 50.30(a) · $151.00 proposed penalty

  22. Written safety program.

    violationRecord 5079714

    30 CFR 56.23002(a) · $151.00 proposed penalty

  23. Construction and maintenance of guards.

    violationRecord 5075665

    30 CFR 56.14112(b) · $313.00 proposed penalty

  24. Construction and maintenance of guards.

    violationRecord 5075664

    30 CFR 56.14112(b) · $313.00 proposed penalty

  25. Housekeeping.

    violationRecord 5075663

    30 CFR 56.20003(a) · $209.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.