  1. Moving machine parts.

    violationRecord 5083876

    30 CFR 57.14107(a)

  2. Moving machine parts.

    violationRecord 5083875

    30 CFR 57.14107(a)

  3. Moving machine parts.

    violationRecord 5080305

    30 CFR 57.14107(a) · Significant and substantial (S&S)

  4. Moving machine parts.

    violationRecord 5083874

    30 CFR 57.14107(a)

  5. Insulation and fittings for power wires and cables.

    violationRecord 5080304

    30 CFR 57.12008

  6. Inspection and cover plates.

    violationRecord 5080303

    30 CFR 57.12032 · Significant and substantial (S&S)

  7. Temporary, portable containers.

    violationRecord 5080302

    30 CFR 47.44(b)

  8. Regular Safety and Health Inspection

    inspectionRecord F02D6E7

    24.0 on-site hours reported

  9. Spot Inspection

    inspectionRecord F036E5F

    4.5 on-site hours reported

  10. Stepping or kneeling on object

    accidentRecord 220262650024

    Days away from work only

    Accident narrative

    EE stepped on a piece of large kiln feed stone and felt pain in their left knee. This incident happened while exiting a surface haul truck.

  11. Verbal Hazard Complaint Inspections

    inspectionRecord F036E5A

    5.8 on-site hours reported

  12. Safe access.

    violationRecord 8242913

    30 CFR 57.11001 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  13. High-pressure hose connections.

    violationRecord 5083684

    30 CFR 57.13021 · $151.00 proposed penalty

  14. Testing grounding systems.

    violationRecord 5083683

    30 CFR 57.12028 · $151.00 proposed penalty

  15. Illumination of surface working areas.

    violationRecord 5083682

    30 CFR 57.17001 · $151.00 proposed penalty

  16. Moving machine parts.

    violationRecord 5083681

    30 CFR 57.14107(b) · Significant and substantial (S&S) · $883.00 proposed penalty

  17. Safety defects; examination, correction and records.

    violationRecord 5083680

    30 CFR 57.14100(b) · $151.00 proposed penalty

  18. Restricted clearance.

    violationRecord 5083679

    30 CFR 57.11008 · $151.00 proposed penalty

  19. Construction and maintenance of guards.

    violationRecord 5083678

    30 CFR 57.14112(a)(1) · Significant and substantial (S&S) · $398.00 proposed penalty

  20. Inspection and cover plates.

    violationRecord 5083677

    30 CFR 57.12032 · Significant and substantial (S&S) · $267.00 proposed penalty

  21. Toilet facilities.

    violationRecord 5083675

    30 CFR 57.20008(a) · $151.00 proposed penalty

  22. Operators' stations.

    violationRecord 5083674

    30 CFR 57.14103(b) · $151.00 proposed penalty

  23. Construction and maintenance of guards.

    violationRecord 5083673

    30 CFR 57.14112(b) · Significant and substantial (S&S) · $398.00 proposed penalty

  24. Safe access.

    violationRecord 5083672

    30 CFR 57.11001 · $226.00 proposed penalty

  25. Exits for surface buildings and structures.

    violationRecord 5083671

    30 CFR 57.4530 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.