  1. Quantity and location of firefighting equipment.

    violationRecord 9778429

    30 CFR 75.1100-2(a)(1)

  2. Maintenance of incombustible content of rock dust.

    violationRecord 9778428

    30 CFR 75.403

  3. Roof control plan.

    violationRecord 9778427

    30 CFR 75.220(a)(1)

  4. Communications facilities; refuge alternatives.

    violationRecord 9778426

    30 CFR 75.1600-3(a)(1)

  5. Regular Safety and Health Inspection

    inspectionRecord F005397

    113.5 on-site hours reported

  6. Installation of water sprinkler systems; requirements.

    violationRecord 5080075

    30 CFR 75.1101-7(a) · Significant and substantial (S&S)

  7. Spot Inspection

    inspectionRecord F000653

    22.0 on-site hours reported

  8. Violation — cited standard not reported

    violationRecord 5080074

    Significant and substantial (S&S)

  9. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 5080073

    30 CFR 75.1103-8(b)

  10. Automatic fire warning devices; actions and response.

    violationRecord 5080072

    30 CFR 75.1103-5(a)(2)

  11. Sampling and monitoring requirements.

    violationRecord 5088628

    30 CFR 75.336(e)(1) · $151.00 proposed penalty

  12. Weekly examination.

    violationRecord 5088824

    30 CFR 75.364(b)(2) · $151.00 proposed penalty

  13. Fall of roof or back

    accidentRecord 220262190027

    Accident only

    Accident narrative

    There was a Non-Injury Roof Fall which must have occurred when there were no persons working as the roof fall was found in the #7 entry inby spad #7761 and outby spad #7769.

  14. Mine ventilation plan; submission and approval.

    violationRecord 5088133

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5088132

    30 CFR 75.202(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5088131

    30 CFR 75.202(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  17. Non-Injury Accident Investigation

    inspectionRecord F018796

    47.5 on-site hours reported

  18. Violation — cited standard not reported

    violationRecord 5088130
  19. Accumulation of combustible materials.

    violationRecord 5088617

    30 CFR 75.400 · $151.00 proposed penalty

  20. Inspection of fire suppression devices.

    violationRecord 5088616

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  21. Power centers.

    violationRecord 5088615

    30 CFR 75.825(c) · $151.00 proposed penalty

  22. Insulating mats at power switches.

    violationRecord 5088614

    30 CFR 77.513 · $151.00 proposed penalty

  23. Mechanical equipment guards.

    violationRecord 5088613

    30 CFR 77.400(a) · $151.00 proposed penalty

  24. Regular Safety and Health Inspection

    inspectionRecord F012021

    70.5 on-site hours reported

  25. Drill dust control at underground areas of underground mines.

    violationRecord 9774086

    30 CFR 72.630(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.