← Twilight Mtr Surface Mine

Twilight Mtr Surface Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Loading and haulage equipment; installations.

    violationRecord 5025663

    30 CFR 77.1605(a) · $151.00 proposed penalty

  2. Machinery and equipment; operation and maintenance.

    violationRecord 5025662

    30 CFR 77.404(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  3. Loading and haulage equipment; installations.

    violationRecord 5025350

    30 CFR 77.1605(k) · $151.00 proposed penalty

  4. Mobile equipment; automatic warning devices.

    violationRecord 5025661

    30 CFR 77.410(c) · $151.00 proposed penalty

  5. Loading and haulage equipment; installations.

    violationRecord 5025660

    30 CFR 77.1605(d) · $226.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 5025349

    30 CFR 77.404(a) · Significant and substantial (S&S) · $336.00 proposed penalty

  7. Ground control; inspection and maintenance; general.

    violationRecord 5025348

    30 CFR 77.1004(b) · $151.00 proposed penalty

  8. Loading and haulage equipment; installations.

    violationRecord 5025140

    30 CFR 77.1605(a) · $151.00 proposed penalty

  9. Loading and haulage equipment; installations.

    violationRecord 5025139

    30 CFR 77.1605(d) · $151.00 proposed penalty

  10. Respirable dust samples; report to operator; posting.

    violationRecord 5025138

    30 CFR 71.208(c) · $151.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F011A31

    122.5 on-site hours reported

  12. Verbal Hazard Complaint Inspections

    inspectionRecord 6321623

    4.0 on-site hours reported

  13. Highwalls, pits and spoil banks; plans.

    violationRecord 5025939

    30 CFR 77.1000 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  14. Highwalls, pits and spoil banks; plans.

    violationRecord 5025938

    30 CFR 77.1000 · Significant and substantial (S&S) · $20,560.00 proposed penalty

  15. Spot Inspection

    inspectionRecord F00D65F

    6.0 on-site hours reported

  16. Spot Inspection

    inspectionRecord F00D65C

    4.0 on-site hours reported

  17. Availability of mine map.

    violationRecord 5025934

    30 CFR 77.1202

  18. Sanitary toilet facilities; maintenance.

    violationRecord 5025933

    30 CFR 71.501

  19. Sanitary toilet facilities; maintenance.

    violationRecord 5025932

    30 CFR 71.501 · $151.00 proposed penalty

  20. Availability of mine map.

    violationRecord 5025931

    30 CFR 77.1202 · $168.00 proposed penalty

  21. Sanitary toilet facilities; maintenance.

    violationRecord 5025930

    30 CFR 71.501 · $168.00 proposed penalty

  22. Highwalls, pits and spoil banks; plans.

    violationRecord 5025929

    30 CFR 77.1000 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  23. Verbal Hazard Complaint Inspections

    inspectionRecord 6322987

    5.0 on-site hours reported

  24. Spot Inspection

    inspectionRecord F00D65B

    18.5 on-site hours reported

  25. Machinery and equipment; operation and maintenance.

    violationRecord 5025926

    30 CFR 77.404(a) · $1,679.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.