Turquoise Ridge safety activity
MSHA violations, accident reports and inspections.
Safety activity
Impoundment Spot Inspection
2.0 on-site hours reported
Disorders (repeated trauma)
Occupatnal illness not deg 1-6
Accident narrative
EE sustained a Standard Threshold Shift in hearing. Confirmed reportable noise induced hearing loss. Occupational exposures could not be ruled out. Confirmation received from Au.D. CPS/A, on 03/17/26. Retraining and refitting complete.
Securing gas cylinders.
30 CFR 57.16005 · $883.00 proposed penalty
Slip or fall of person
Days restricted activity only
Accident narrative
IP descended from an AD30 Haul Truck and stepped on a rock that shifted underneath EE's left foot, causing EE's ankle to roll, and EE fell to the ground.
Safety defects; examination, correction and records.
30 CFR 56.14100(c) · Significant and substantial (S&S) · $14,557.00 proposed penalty
Underground shops.
30 CFR 57.4761(a)(2)(i) · $1,320.00 proposed penalty
Underground shops.
30 CFR 57.4761(a)(2)(i) · $1,320.00 proposed penalty
Securing gas cylinders.
30 CFR 57.16005 · $883.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $2,503.00 proposed penalty
Securing gas cylinders.
30 CFR 57.16005 · $883.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $1,818.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $883.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(5) · $1,320.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $2,312.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $1,550.00 proposed penalty
Barricades and warning signs.
30 CFR 57.20011 · $2,503.00 proposed penalty
Protection of persons at switchgear.
30 CFR 57.12020 · Significant and substantial (S&S) · $14,557.00 proposed penalty
Safe access.
30 CFR 57.11001 · $6,037.00 proposed penalty
Securing gas cylinders.
30 CFR 57.16005 · $883.00 proposed penalty
Securing gas cylinders.
30 CFR 57.16005 · $883.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $1,431.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $2,312.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $1,431.00 proposed penalty
Safe access.
30 CFR 57.11001 · $1,818.00 proposed penalty
High-pressure hose connections.
30 CFR 57.13021 · $883.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.