← TUNNEL RIDGE MINE

TUNNEL RIDGE MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 9582408

    30 CFR 75.400 · $151.00 proposed penalty

  2. Mobile equipment; automatic warning devices.

    violationRecord 9939108

    30 CFR 77.410(a)(1) · $151.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F0141C9

    103(i) · 5.0 on-site hours reported

  4. Hoisting of materials.

    violationRecord 9939107

    30 CFR 77.210(a) · $151.00 proposed penalty

  5. Storage of materials.

    violationRecord 9939106

    30 CFR 77.208(e) · $151.00 proposed penalty

  6. Loading and haulage equipment; installations.

    violationRecord 9939105

    30 CFR 77.1605(d) · $151.00 proposed penalty

  7. Quantity and location of firefighting equipment.

    violationRecord 9600954

    30 CFR 77.1109(d) · $151.00 proposed penalty

  8. Mechanical equipment guards.

    violationRecord 9939104

    30 CFR 75.1722(b) · $151.00 proposed penalty

  9. High-voltage underground equipment; grounding.

    violationRecord 9939103

    30 CFR 75.811 · $245.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9939102

    30 CFR 75.400 · $151.00 proposed penalty

  11. Installation of high-voltage transmission cables.

    violationRecord 9255919

    30 CFR 75.807 · $245.00 proposed penalty

  12. Health Technical Investigation

    inspectionRecord F038EE3

    10.5 on-site hours reported

  13. Electric equipment; examination, testing, and maintenance.

    violationRecord 9939101

    30 CFR 77.502 · $245.00 proposed penalty

  14. Loading and haulage equipment; installations.

    violationRecord 9939100

    30 CFR 77.1605(d) · $151.00 proposed penalty

  15. Mechanical equipment guards.

    violationRecord 9939099

    30 CFR 77.400(a) · $151.00 proposed penalty

  16. Mechanical equipment guards.

    violationRecord 9939098

    30 CFR 77.400(a) · $151.00 proposed penalty

  17. Loading and haulage equipment; operation.

    violationRecord 9939097

    30 CFR 77.1607(n) · $151.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 9586594

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  19. Self-rescue devices; use and location requirements.

    violationRecord 9586593

    30 CFR 75.1714-2(b) · $245.00 proposed penalty

  20. Violation — cited standard not reported

    violationRecord 9188247

    $658.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 9188246

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  22. Electrical Technical Investigation

    inspectionRecord 4012015

    15.0 on-site hours reported

  23. Spot Inspections

    inspectionRecord F0141C8

    103(i) · 6.0 on-site hours reported

  24. Criteria—Belt conveyors.

    violationRecord 9255918

    30 CFR 75.1403-5(g) · $151.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 9939096

    30 CFR 75.380(d)(7)(vii) · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.