Trixie safety activity
MSHA violations, accident reports and inspections.
Safety activity
Inspection and cover plates.
30 CFR 57.12032
Safety defects; examination, correction and records.
30 CFR 57.14100(b)
Regular Safety and Health Inspection
20.0 on-site hours reported
Verbal Hazard Complaint Inspections
7.0 on-site hours reported
Warning signs.
30 CFR 57.4101
Requirement for container labels.
30 CFR 47.41(a)
Safety can use.
30 CFR 57.4402
Requirement for container labels.
30 CFR 47.41(a)
Parking procedures for unattended equipment.
30 CFR 57.14207
Loading, blasting, and security.
30 CFR 57.6306(f)(3) · Significant and substantial (S&S)
Loading, blasting, and security.
30 CFR 57.6306(f)(1) · Significant and substantial (S&S)
Regular Safety and Health Inspection
14.5 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 56.14100(c) · $151.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
19.5 on-site hours reported
Hoisting
Accident only
Accident narrative
Power loss overnight, when we restored power we found the system needed to be rebooted. We rebooted the system it started working.
Ventilation plan.
30 CFR 57.8520 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 57.12008 · $151.00 proposed penalty
Regular Safety and Health Inspection
14.5 on-site hours reported
Regular Safety and Health Inspection
13.8 on-site hours reported
Berms or guardrails.
30 CFR 57.9300(a) · $151.00 proposed penalty
Exposure limits for airborne contaminants.
30 CFR 57.5001(a)/57.5005 · Significant and substantial (S&S) · $642.00 proposed penalty
Spot Inspection
6.0 on-site hours reported
Regular Safety and Health Inspection
22.5 on-site hours reported
Inspection and cover plates.
30 CFR 57.12032 · $755.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.