The Monarch Cement Company safety activity
MSHA violations, accident reports and inspections.
Safety activity
Closure of valves.
30 CFR 56.4603(b) · $151.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $151.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $151.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $151.00 proposed penalty
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
Miners finger was caught in a belt being tested on an air compressor.
Powered haulage
Days away from work only
Accident narrative
Technician removing a relief valve from the rail carriage hydraulic system to troubleshoot Shuttle Wagon asset causing rail carriage assembly to lower and contact technicians left thigh. Minor laceration and a contusion to thigh.
Compliance Follow-up Inspection
0.0 on-site hours reported
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
IP set hammer to the side to clean pieces of concrete when hammer slipped and smashed finger.
Safe access.
30 CFR 56.11001 · $151.00 proposed penalty
Protection for openings around travelways.
30 CFR 56.11012 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Protection of gas cylinder valves.
30 CFR 56.16006 · $151.00 proposed penalty
Parking procedures for unattended equipment.
30 CFR 56.14207 · $151.00 proposed penalty
First aid.
30 CFR 56.18010 · $245.00 proposed penalty
Parking procedures for unattended equipment.
30 CFR 56.14207 · $151.00 proposed penalty
Barricades and warning signs.
30 CFR 56.20011 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(a) · $165.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $313.00 proposed penalty
Training plan implementation.
30 CFR 46.4(a)(1) · $313.00 proposed penalty
Dump site restraints.
30 CFR 56.9301 · Significant and substantial (S&S) · $465.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $313.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $313.00 proposed penalty
Parking procedures for unattended equipment.
30 CFR 56.14207 · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $151.00 proposed penalty
Securing gas cylinders.
30 CFR 56.16005 · $151.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.