← Texas-Lehigh Cement Plant & Quarry

Texas-Lehigh Cement Plant & Quarry safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Insulation and fittings for power wires and cables.

    violationRecord 5004809

    30 CFR 56.12008 · $209.00 proposed penalty

  2. Inspection.

    violationRecord 5004808

    30 CFR 56.4201(a)(1) · $209.00 proposed penalty

  3. Air receiver tanks.

    violationRecord 5004807

    30 CFR 56.13011 · $209.00 proposed penalty

  4. Inspection and cover plates.

    violationRecord 5004806

    30 CFR 56.12032 · $209.00 proposed penalty

  5. Insulation and fittings for power wires and cables.

    violationRecord 5004805

    30 CFR 56.12008 · $209.00 proposed penalty

  6. General requirements.

    violationRecord 5004804

    30 CFR 56.4200(b)(2) · $209.00 proposed penalty

  7. Unguarded conveyors with adjacent travelways.

    violationRecord 5004803

    30 CFR 56.14109(a) · $313.00 proposed penalty

  8. Authorized persons at major electrical installations.

    violationRecord 5004802

    30 CFR 56.12022 · $209.00 proposed penalty

  9. Illumination of surface working areas.

    violationRecord 5004801

    30 CFR 56.17001 · $209.00 proposed penalty

  10. Safety defects; examination, correction and records.

    violationRecord 5003069

    30 CFR 56.14100(a) · $151.00 proposed penalty

  11. Safety defects; examination, correction and records.

    violationRecord 5003068

    30 CFR 56.14100(d) · $151.00 proposed penalty

  12. Electrical conductors.

    violationRecord 5003066

    30 CFR 56.12004 · $151.00 proposed penalty

  13. Gauges and regulators.

    violationRecord 5003065

    30 CFR 56.4602 · $177.00 proposed penalty

  14. Horns and backup alarms.

    violationRecord 5003064

    30 CFR 56.14132(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  15. Construction and maintenance of guards.

    violationRecord 5003063

    30 CFR 56.14112 · $209.00 proposed penalty

  16. Inspection and cover plates.

    violationRecord 5003062

    30 CFR 56.12032 · $209.00 proposed penalty

  17. Machinery, equipment, and tools.

    violationRecord 5003061

    30 CFR 56.14205 · Significant and substantial (S&S) · $5,144.00 proposed penalty

  18. Illumination of surface working areas.

    violationRecord 5003059

    30 CFR 56.17001 · $209.00 proposed penalty

  19. Identification of power switches.

    violationRecord 9798800

    30 CFR 56.12018 · $209.00 proposed penalty

  20. Inspection.

    violationRecord 9798799

    30 CFR 56.4201(a)(1) · $209.00 proposed penalty

  21. Inspection and cover plates.

    violationRecord 9798798

    30 CFR 56.12032 · $209.00 proposed penalty

  22. Insulation and fittings for power wires and cables.

    violationRecord 9798797

    30 CFR 56.12008 · $209.00 proposed penalty

  23. Insulation and fittings for power wires and cables.

    violationRecord 9798796

    30 CFR 56.12008 · $209.00 proposed penalty

  24. General requirements.

    violationRecord 9798795

    30 CFR 56.4200(b)(2) · $209.00 proposed penalty

  25. Protection of gas cylinder valves.

    violationRecord 9798794

    30 CFR 56.16006 · $209.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.