← SWILLEY PIT & PLANT

SWILLEY PIT & PLANT safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F02F5CE

    2.8 on-site hours reported

  2. Requirement for container labels.

    violationRecord 5175214

    30 CFR 47.41(a) · $151.00 proposed penalty

  3. Regular Safety and Health Inspection

    inspectionRecord F02F5BA

    7.5 on-site hours reported

  4. Records of training.

    violationRecord 5009332

    30 CFR 46.9(c)(3) · $151.00 proposed penalty

  5. Protection of gas cylinder valves.

    violationRecord 5009331

    30 CFR 56.16006 · $151.00 proposed penalty

  6. Warnings prior to starting or moving equipment.

    violationRecord 5009330

    30 CFR 56.14200 · $151.00 proposed penalty

  7. Inspection.

    violationRecord 5009329

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  8. Regular Safety and Health Inspection

    inspectionRecord F014BC5

    6.5 on-site hours reported

  9. Guarding electrical connections and resistor grids.

    violationRecord 5002236

    30 CFR 56.12023 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.