SWENSON GRAY QUARRY safety activity
MSHA violations, accident reports and inspections.
Safety activity
Examination of working places.
30 CFR 56.18002(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
19.3 on-site hours reported
Requirements for written safety program.
30 CFR 56.23003(a) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Regular Safety and Health Inspection
14.3 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
1.0 on-site hours reported
Moving machine parts.
30 CFR 56.14107(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Life jackets and belts.
30 CFR 56.15020 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Protection of persons at switchgear.
30 CFR 56.12020 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Handling of materials
Dys awy frm wrk & restrctd act
Accident narrative
EE was using a log chain to adjust the stone under the radius. EE put the lug too tight against the stone and when EE released the stone to advance it fell back on EE's ankle.
Handling of materials
Days away from work only
Accident narrative
ee had just finished breaking a slab into blocks. ee was putting a Retractable back in the storage box it hit the top of the box causing it to come down and punch their finger.
Extinguisher recharging or replacement.
30 CFR 56.4203 · $151.00 proposed penalty
Inspection.
30 CFR 56.4201(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
10.0 on-site hours reported
Other
Days restricted activity only
Accident narrative
EE was getting out of the forklift, they extended their arms up when they felt a pop in their lower back. Supervisor was not on site and the communication misunderstood in regard to the injury.
Regular Safety and Health Inspection
7.5 on-site hours reported
Housekeeping.
30 CFR 56.20003(a) · $151.00 proposed penalty
Protection for openings around travelways.
30 CFR 56.11012 · Significant and substantial (S&S) · $336.00 proposed penalty
Temporary, portable containers.
30 CFR 47.44(b) · $151.00 proposed penalty
Handling of materials
Dys awy frm wrk & restrctd act
Accident narrative
employee was pushing 7 pieces of curb from the splitter to the plunge saw, with another person, when EE felt a pop, EE stopped instantly.
Examination of working places.
30 CFR 56.18002(b) · $151.00 proposed penalty
Housekeeping.
30 CFR 56.20003(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Protection of persons at switchgear.
30 CFR 56.12020 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.