← Superior Cleaning Plant

Superior Cleaning Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mechanical equipment guards.

    violationRecord 5135527

    30 CFR 77.400(c)

  2. Inspection and cover plates.

    violationRecord 5135526

    30 CFR 77.512

  3. Mechanical equipment guards.

    violationRecord 5135525

    30 CFR 77.400(c)

  4. Loading and haulage equipment; operation.

    violationRecord 5135524

    30 CFR 77.1607(cc) · Significant and substantial (S&S)

  5. Travelways at surface installations.

    violationRecord 5135523

    30 CFR 77.205(b) · Significant and substantial (S&S)

  6. Mechanical equipment guards.

    violationRecord 5135522

    30 CFR 77.400(d)

  7. Openings in surface installations; safeguards.

    violationRecord 5135521

    30 CFR 77.204 · Significant and substantial (S&S)

  8. Mechanical equipment guards.

    violationRecord 5135520

    30 CFR 77.400(a)

  9. Accumulations of combustible materials.

    violationRecord 5135519

    30 CFR 77.1104

  10. Regular Safety and Health Inspection

    inspectionRecord F022940

    0.0 on-site hours reported

  11. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5092355

    30 CFR 77.1606(c) · $151.00 proposed penalty

  12. Mobile equipment; automatic warning devices.

    violationRecord 5092354

    30 CFR 77.410(b) · $151.00 proposed penalty

  13. Electric equipment; examination, testing, and maintenance.

    violationRecord 5131086

    30 CFR 77.502 · $151.00 proposed penalty

  14. Dust accumulations in surface installations.

    violationRecord 5131085

    30 CFR 77.202 · $151.00 proposed penalty

  15. Accumulations of combustible materials.

    violationRecord 5131084

    30 CFR 77.1104 · $151.00 proposed penalty

  16. Examination and maintenance of firefighting equipment.

    violationRecord 5131083

    30 CFR 77.1110 · $151.00 proposed penalty

  17. Mobile equipment; automatic warning devices.

    violationRecord 5131082

    30 CFR 77.410(b) · $151.00 proposed penalty

  18. Loading and haulage equipment; installations.

    violationRecord 5131081

    30 CFR 77.1605(d) · $151.00 proposed penalty

  19. Examination and maintenance of firefighting equipment.

    violationRecord 5131080

    30 CFR 77.1110 · $151.00 proposed penalty

  20. Loading and haulage equipment; installations.

    violationRecord 5131079

    30 CFR 77.1605(k) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  21. Flammable liquids; storage.

    violationRecord 5131078

    30 CFR 77.1103(d) · $151.00 proposed penalty

  22. Verbal Hazard Complaint Inspections

    inspectionRecord F010861

    4.5 on-site hours reported

  23. Regular Safety and Health Inspection

    inspectionRecord F010862

    70.8 on-site hours reported

  24. Travelways at surface installations.

    violationRecord 5092330

    30 CFR 77.205(b) · Significant and substantial (S&S) · $549.00 proposed penalty

  25. Surface installations; general.

    violationRecord 5092329

    30 CFR 77.200 · Significant and substantial (S&S) · $818.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.