SUFCO safety activity
MSHA violations, accident reports and inspections.
Safety activity
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(d) · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(d) · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $226.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $267.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $267.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $226.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $313.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $267.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $267.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $288.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $313.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $10,569.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.