Stonecoal Branch Mine No. 2 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $549.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $818.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Regular Safety and Health Inspection
275.0 on-site hours reported
Fall of roof or back
Days away from work only
Accident narrative
Employee was stacking supplies on the roof bolting machine when a piece of draw rock fell from the top and struck them on the thigh. The employee was injured on 6/11/2025 and was treated, released, and returned to work until 6/21/2025, when they revisited the hospital and was written off work.
Mine ventilation plan; submission and approval.
30 CFR 75.370(d) · $4,047.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(d) · $818.00 proposed penalty
Roof control plan.
30 CFR 75.220(c) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,550.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,550.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Weekly examination.
30 CFR 75.364(h) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $1,219.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $465.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.