← Stonecoal Branch Mine No. 2

Stonecoal Branch Mine No. 2 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Machinery and equipment; operation and maintenance.

    violationRecord 5093097

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $818.00 proposed penalty

  2. Roof control plan.

    violationRecord 5093096

    30 CFR 75.220(a)(1) · $549.00 proposed penalty

  3. Ventilation controls.

    violationRecord 5093095

    30 CFR 75.333(d)(3) · $1,550.00 proposed penalty

  4. Preshift examination at fixed intervals.

    violationRecord 5093094

    30 CFR 75.360(f) · $151.00 proposed penalty

  5. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5093093

    30 CFR 75.1714-3(d) · $4,383.00 proposed penalty

  6. Installation of high-voltage transmission cables.

    violationRecord 5093092

    30 CFR 75.807 · $1,037.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5093091

    30 CFR 75.333(d)(3) · $465.00 proposed penalty

  8. Roof control plan.

    violationRecord 5093090

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  9. Power wires and cables; insulation and protection.

    violationRecord 5093089

    30 CFR 75.517 · $697.00 proposed penalty

  10. Drill dust control at underground areas of underground mines.

    violationRecord 5093088

    30 CFR 72.630(b) · $2,936.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 5093087

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  12. Ventilation controls.

    violationRecord 5093086

    30 CFR 75.333(d)(3) · $465.00 proposed penalty

  13. On-shift examination.

    violationRecord 5093085

    30 CFR 75.362(g)(2)(ii) · $151.00 proposed penalty

  14. Mine map.

    violationRecord 5093084

    30 CFR 75.1200 · $151.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5093083

    30 CFR 75.370(a)(1) · $697.00 proposed penalty

  16. Proximity detection systems.

    violationRecord 5093082

    30 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5093081

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  18. Power wires and cables; insulation and protection.

    violationRecord 5093080

    30 CFR 75.517 · $1,550.00 proposed penalty

  19. Underground electrical installations.

    violationRecord 5093079

    30 CFR 75.340(a)(1)(i) · $883.00 proposed penalty

  20. Power wires and cables; insulation and protection.

    violationRecord 5093078

    30 CFR 75.517 · $7,676.00 proposed penalty

  21. Power wires and cables; insulation and protection.

    violationRecord 5093077

    30 CFR 75.517 · $3,448.00 proposed penalty

  22. Cable fittings; suitability.

    violationRecord 5093076

    30 CFR 75.515 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  23. Installation of electric equipment and conductors; permissibility.

    violationRecord 5093075

    30 CFR 75.1002(a) · $177.00 proposed penalty

  24. Methane monitors.

    violationRecord 5093074

    30 CFR 75.342(a)(4) · $193.00 proposed penalty

  25. Electric equipment; examination, testing and maintenance.

    violationRecord 5093073

    30 CFR 75.512 · $549.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.