← Stonecoal Branch Mine No. 2

Stonecoal Branch Mine No. 2 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Power wires and cables; insulation and protection.

    violationRecord 5093131

    30 CFR 75.517 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5093130

    30 CFR 75.512 · $177.00 proposed penalty

  3. Ventilation controls.

    violationRecord 5093129

    30 CFR 75.333(c)(1) · $151.00 proposed penalty

  4. Preshift examination at fixed intervals.

    violationRecord 5093128

    30 CFR 75.360(f) · $151.00 proposed penalty

  5. Electric equipment; examination, testing and maintenance.

    violationRecord 5093127

    30 CFR 75.512 · Significant and substantial (S&S) · $9,757.00 proposed penalty

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5093126

    30 CFR 75.380(f)(3)(iii) · $1,219.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5093125

    30 CFR 75.333(h) · $592.00 proposed penalty

  8. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5093124

    30 CFR 75.701 · $1,320.00 proposed penalty

  9. Identification of circuit breakers.

    violationRecord 5093123

    30 CFR 75.904 · Significant and substantial (S&S) · $5,144.00 proposed penalty

  10. Maintenance of incombustible content of rock dust.

    violationRecord 5093122

    30 CFR 75.403 · $151.00 proposed penalty

  11. Permissible electric face equipment; maintenance.

    violationRecord 5096527

    30 CFR 75.503 · $226.00 proposed penalty

  12. Verbal Hazard Complaint Inspections

    inspectionRecord F006C8F

    8.0 on-site hours reported

  13. Non-Injury Accident Investigation

    inspectionRecord F006C90

    7.3 on-site hours reported

  14. Roof control plan.

    violationRecord 5096526

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  15. Violation — cited standard not reported

    violationRecord 5096525
  16. Protection from falls of roof, face and ribs.

    violationRecord 5096524

    30 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  17. Other safeguards.

    violationRecord 5096523

    30 CFR 75.1403 · $245.00 proposed penalty

  18. Other safeguards.

    violationRecord 5096522

    30 CFR 75.1403 · $245.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5093121

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5093120

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  21. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5093119

    30 CFR 75.1731(a) · $209.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5092504

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  23. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5093118

    30 CFR 75.1731(a) · $209.00 proposed penalty

  24. Other safeguards.

    violationRecord 5093117

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  25. Machinery and equipment; operation and maintenance.

    violationRecord 5092503

    30 CFR 75.1725(a) · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.