← Stavola Construction Materials, Inc.

Stavola Construction Materials, Inc. safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F04C5EA

    1.8 on-site hours reported

  2. Compliance Follow-up Inspection

    inspectionRecord F02E2E8

    0.0 on-site hours reported

  3. Compliance Follow-up Inspection

    inspectionRecord 6900028

    0.0 on-site hours reported

  4. Compliance Follow-up Inspection

    inspectionRecord 6900026

    3.8 on-site hours reported

  5. Powered haulage

    accidentRecord 220262110001

    Dys awy frm wrk & restrctd act

    Accident narrative

    Employee was cleaning the C-3 Conveyor Deck with a shovel while the plant was running. EE's Left Hand got caught by a trough Idler and was pinched between the belt & idler.

  6. Brakes.

    violationRecord 5079956

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  7. Construction and maintenance of guards.

    violationRecord 5079955

    30 CFR 56.14112(a)(1) · $151.00 proposed penalty

  8. Electrical conductors.

    violationRecord 5079954

    30 CFR 56.12004 · Significant and substantial (S&S) · $151.00 proposed penalty

  9. Trimming stockpile and muckpile faces.

    violationRecord 5079953

    30 CFR 56.9314 · Significant and substantial (S&S) · $959.00 proposed penalty

  10. Electrical conductors.

    violationRecord 5079952

    30 CFR 56.12004 · $151.00 proposed penalty

  11. Electrical conductors.

    violationRecord 5079951

    30 CFR 56.12004 · $151.00 proposed penalty

  12. Electrical conductors.

    violationRecord 5079950

    30 CFR 56.12004 · $151.00 proposed penalty

  13. Construction and maintenance of guards.

    violationRecord 5079949

    30 CFR 56.14112(a)(1) · Significant and substantial (S&S) · $432.00 proposed penalty

  14. Safety defects; examination, correction and records.

    violationRecord 5079948

    30 CFR 56.14100(c) · Significant and substantial (S&S) · $193.00 proposed penalty

  15. Construction and maintenance of guards.

    violationRecord 5079947

    30 CFR 56.14112(a) · $151.00 proposed penalty

  16. Construction and maintenance of guards.

    violationRecord 5079946

    30 CFR 56.14112(a)(1) · $151.00 proposed penalty

  17. Construction and maintenance of guards.

    violationRecord 5079945

    30 CFR 56.14112(a)(1) · $151.00 proposed penalty

  18. Horns and backup alarms.

    violationRecord 5079944

    30 CFR 56.14132(a) · $151.00 proposed penalty

  19. Housekeeping.

    violationRecord 5079943

    30 CFR 56.20003(a) · $151.00 proposed penalty

  20. Construction and maintenance of guards.

    violationRecord 5079942

    30 CFR 56.14112(a)(1) · $151.00 proposed penalty

  21. Construction and maintenance of guards.

    violationRecord 5079941

    30 CFR 56.14112(a)(1) · $151.00 proposed penalty

  22. Combustible waste.

    violationRecord 5079940

    30 CFR 56.4104(b) · $151.00 proposed penalty

  23. Violation — cited standard not reported

    violationRecord 5079939
  24. Pit or quarry wall perimeter.

    violationRecord 5079938

    30 CFR 56.3131 · $151.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord F02E2E3

    66.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.