← Squid Quarry 1

Squid Quarry 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F037BF1

    5.0 on-site hours reported

  2. Requirement for container labels.

    violationRecord 5077831

    30 CFR 47.41(a) · $151.00 proposed penalty

  3. Warning signs.

    violationRecord 5077830

    30 CFR 56.4101 · $151.00 proposed penalty

  4. Compliance Follow-up Inspection

    inspectionRecord F024792

    0.0 on-site hours reported

  5. Berms or guardrails.

    violationRecord 5074233

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F02478E

    22.3 on-site hours reported

  7. Safe access.

    violationRecord 5074232

    30 CFR 56.11001 · Significant and substantial (S&S) · $366.00 proposed penalty

  8. Safety belts and lines.

    violationRecord 5074231

    30 CFR 56.15005 · Significant and substantial (S&S) · $165.00 proposed penalty

  9. General requirements.

    violationRecord 5074230

    30 CFR 56.4200(a) · $151.00 proposed penalty

  10. First aid.

    violationRecord 5074229

    30 CFR 56.18010 · $151.00 proposed penalty

  11. Examination of working places.

    violationRecord 5074228

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  12. Written safety program.

    violationRecord 5074227

    30 CFR 56.23002(a) · $151.00 proposed penalty

  13. Requirement for a HazCom program.

    violationRecord 5074226

    30 CFR 47.31(a) · $151.00 proposed penalty

  14. Temporary, portable containers.

    violationRecord 5074225

    30 CFR 47.44(b) · $151.00 proposed penalty

  15. Moving machine parts.

    violationRecord 5074224

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  16. Brakes.

    violationRecord 5074223

    30 CFR 56.14101(a)(3) · $151.00 proposed penalty

  17. Horns and backup alarms.

    violationRecord 5074222

    30 CFR 56.14132(a) · $151.00 proposed penalty

  18. Procedures during repairs or maintenance.

    violationRecord 5074221

    30 CFR 56.14105 · Significant and substantial (S&S) · $165.00 proposed penalty

  19. Eye protection.

    violationRecord 5074220

    30 CFR 56.15004 · Significant and substantial (S&S) · $288.00 proposed penalty

  20. Training plans.

    violationRecord 5074219

    30 CFR 46.3(a) · $151.00 proposed penalty

  21. New miner training.

    violationRecord 5074218

    30 CFR 46.5(a) · Significant and substantial (S&S) · $374.00 proposed penalty

  22. Notification by operator.

    violationRecord 5074217

    30 CFR 41.11(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.