  1. Spot Inspections

    inspectionRecord F00672D

    103(i) · 7.0 on-site hours reported

  2. Mine ventilation plan; submission and approval.

    violationRecord 5026271

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  3. Ventilation controls.

    violationRecord 5026270

    30 CFR 75.333(h) · $209.00 proposed penalty

  4. Cable fittings; suitability.

    violationRecord 9847409

    30 CFR 75.515 · $6,540.00 proposed penalty

  5. Spot Inspections

    inspectionRecord 6321492

    103(i) · 7.0 on-site hours reported

  6. Spot Inspections

    inspectionRecord F00672C

    103(i) · 4.5 on-site hours reported

  7. Accumulation of combustible materials.

    violationRecord 9847339

    30 CFR 75.400 · $245.00 proposed penalty

  8. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5026269

    30 CFR 75.601-1 · $336.00 proposed penalty

  9. Power wires and cables; insulation and protection.

    violationRecord 5026268

    30 CFR 75.517 · $1,320.00 proposed penalty

  10. Machinery and equipment; operation and maintenance.

    violationRecord 5026267

    30 CFR 75.1725(a) · $3,184.00 proposed penalty

  11. Spot Inspections

    inspectionRecord 6320441

    103(i) · 6.0 on-site hours reported

  12. Mine ventilation plan; submission and approval.

    violationRecord 5026266

    30 CFR 75.370(a)(1) · $755.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5026265

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 9847408

    30 CFR 75.400 · $398.00 proposed penalty

  15. Roof control plan.

    violationRecord 9847407

    30 CFR 75.220(a)(1) · $1,550.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F00672B

    103(i) · 7.0 on-site hours reported

  17. Temporary notations, revisions, and supplements.

    violationRecord 5026264

    30 CFR 75.1202 · $151.00 proposed penalty

  18. Condition and examination of firefighting equipment.

    violationRecord 5026263

    30 CFR 75.1100-3 · $465.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5026262

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  20. Spot Inspections

    inspectionRecord 6319297

    103(i) · 5.5 on-site hours reported

  21. Cable fittings; suitability.

    violationRecord 5025319

    30 CFR 75.515 · $288.00 proposed penalty

  22. Roof control plan.

    violationRecord 5025318

    30 CFR 75.220(a)(1) · $432.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5025317

    30 CFR 75.370(a)(1) · $549.00 proposed penalty

  24. Travelways at surface installations.

    violationRecord 5026261

    30 CFR 77.205(e) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 9847406

    30 CFR 75.400 · $592.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.