  1. Verbal Hazard Complaint Inspections

    inspectionRecord F005854

    5.8 on-site hours reported

  2. Machinery and equipment; operation and maintenance.

    violationRecord 5090035

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5090034

    30 CFR 75.400 · $549.00 proposed penalty

  4. Power wires and cables; insulation and protection.

    violationRecord 5090033

    30 CFR 75.517 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  5. On-shift examination.

    violationRecord 5090032

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  6. Inspection of dry powder chemical systems.

    violationRecord 5028253

    30 CFR 75.1101-22(a) · $465.00 proposed penalty

  7. Identification of circuit breakers.

    violationRecord 5028252

    30 CFR 75.904 · $1,679.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F00C09B

    103(i) · 5.0 on-site hours reported

  9. Power wires and cables; insulation and protection.

    violationRecord 5028685

    30 CFR 75.517 · Significant and substantial (S&S) · $10,569.00 proposed penalty

  10. Spot Inspections

    inspectionRecord F00EB3B

    103(i) · 6.0 on-site hours reported

  11. Spot Inspections

    inspectionRecord 6319299

    103(i) · 4.5 on-site hours reported

  12. Methane monitors.

    violationRecord 5028248

    30 CFR 75.342(a)(4) · $755.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5028246

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  14. Roof control plan.

    violationRecord 5028247

    30 CFR 75.220(a)(1) · $2,712.00 proposed penalty

  15. Verbal Hazard Complaint Inspections

    inspectionRecord F006738

    6.5 on-site hours reported

  16. Criteria—Haulage; general.

    violationRecord 5028072

    30 CFR 75.1403-10(l) · $313.00 proposed penalty

  17. Additional self-contained self-rescuers (SCSRs).

    violationRecord 9840142

    30 CFR 75.1714-4(f) · $465.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F005852

    103(i) · 5.0 on-site hours reported

  19. Spot Inspections

    inspectionRecord 6321167

    103(i) · 4.0 on-site hours reported

  20. Electric equipment; examination, testing and maintenance.

    violationRecord 5090030

    30 CFR 75.512 · $818.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5090029

    30 CFR 75.400 · $755.00 proposed penalty

  22. Power wires and cables; insulation and protection.

    violationRecord 5090028

    30 CFR 75.517 · Significant and substantial (S&S) · $27,603.00 proposed penalty

  23. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5028684

    30 CFR 75.1107-9(a)(1) · $209.00 proposed penalty

  24. Verbal Hazard Complaint Inspections

    inspectionRecord F00EB39

    11.0 on-site hours reported

  25. Spot Inspections

    inspectionRecord F005759

    103(i) · 3.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.