← Speed Mine

Speed Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Daily examination of hoisting equipment.

    violationRecord 5028259

    30 CFR 75.1400-3(b)(3) · $398.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F00C09F

    103(i) · 6.5 on-site hours reported

  3. Other safeguards.

    violationRecord 5090041

    30 CFR 75.1403 · $313.00 proposed penalty

  4. Other safeguards.

    violationRecord 5090040

    30 CFR 75.1403 · $313.00 proposed penalty

  5. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5090039

    30 CFR 75.601-1 · $366.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F00EB3F

    103(i) · 6.0 on-site hours reported

  7. Accumulation of combustible materials.

    violationRecord 5028084

    30 CFR 75.400 · Significant and substantial (S&S) · $7,676.00 proposed penalty

  8. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5028083

    30 CFR 75.1731(a) · $1,126.00 proposed penalty

  9. Mechanical equipment guards.

    violationRecord 5028085

    30 CFR 75.1722(c) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  10. Verbal Hazard Complaint Inspections

    inspectionRecord F00673A

    9.0 on-site hours reported

  11. Spot Inspections

    inspectionRecord F00EB3E

    103(i) · 2.5 on-site hours reported

  12. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5090037

    30 CFR 75.601-1 · $245.00 proposed penalty

  13. Escapeways; bituminous and lignite mines.

    violationRecord 5028691

    30 CFR 75.380(d)(7)(iii) · $177.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5028690

    30 CFR 75.400 · $432.00 proposed penalty

  15. Electric equipment and circuits; overload and short circuit protection; minimum requirements.

    violationRecord 5028689

    30 CFR 75.518-1 · $209.00 proposed penalty

  16. Identification of circuit breakers.

    violationRecord 5028688

    30 CFR 75.904 · $193.00 proposed penalty

  17. Electric equipment and circuits; overload and short circuit protection; minimum requirements.

    violationRecord 5028687

    30 CFR 75.518-1 · $209.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5028686

    30 CFR 75.400 · $432.00 proposed penalty

  19. Automatic fire warning devices; actions and response.

    violationRecord 5028256

    30 CFR 75.1103-5(a)(2) · $398.00 proposed penalty

  20. Mechanical equipment guards.

    violationRecord 5028255

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  21. Verbal Hazard Complaint Inspections

    inspectionRecord F0058B7

    5.0 on-site hours reported

  22. Daily examination of hoisting equipment.

    violationRecord 5027945

    30 CFR 75.1400-3(b)(5) · $1,550.00 proposed penalty

  23. Other safeguards.

    violationRecord 9840143

    30 CFR 75.1403

  24. Spot Inspections

    inspectionRecord F0010F2

    103(i) · 4.5 on-site hours reported

  25. Mine ventilation plan; submission and approval.

    violationRecord 5028254

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $7,676.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.