Speed Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 7.0 on-site hours reported
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Emergency tethers.
30 CFR 75.1714-6 · $336.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $549.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
30 CFR 75.1107-9(a)(1) · $336.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
First-aid equipment; location; minimum requirements.
30 CFR 75.1713-7(c) · $336.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $366.00 proposed penalty
Automatic emergency-parking brakes.
30 CFR 75.523-3(c)(2) · $336.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Machinery
Days restricted activity only
Accident narrative
EE was injured when a rib measuring 34" X 154" X 12" rolled out and struck them in the lower right leg.
Spot Inspections
103(i) · 6.5 on-site hours reported
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
30 CFR 75.1107-1(a)(3)(ii) · $336.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $9,004.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Roof bolting.
30 CFR 75.204(c)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Roof bolting.
30 CFR 75.204(c)(1) · $336.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Roof bolting.
30 CFR 75.204(f)(7) · $336.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.