SPECIALTY GRANULES LLC-ANNAPOLIS QUARRY safety activity
MSHA violations, accident reports and inspections.
Safety activity
Compliance Follow-up Inspection
0.0 on-site hours reported
Impoundment Spot Inspection
0.0 on-site hours reported
Verbal Hazard Complaint Inspections
2.3 on-site hours reported
Spot Inspection
18.8 on-site hours reported
Impoundment Spot Inspection
4.0 on-site hours reported
Compliance Follow-up Inspection
1.8 on-site hours reported
Electrical conductors.
30 CFR 56.12004 · $592.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $177.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $209.00 proposed penalty
Inspection.
30 CFR 56.4201(a)(1) · $313.00 proposed penalty
Retaining dams.
30 CFR 56.20010 · $697.00 proposed penalty
Guarding electrical connections and resistor grids.
30 CFR 56.12023 · $697.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $697.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $209.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $209.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $209.00 proposed penalty
Regular Safety and Health Inspection
39.5 on-site hours reported
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $818.00 proposed penalty
Distribution boxes.
30 CFR 56.12006 · $818.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $818.00 proposed penalty
Temporary, portable containers.
30 CFR 47.44(b) · $366.00 proposed penalty
Berms or guardrails.
30 CFR 56.9300(a) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.