  1. Spot Inspection

    inspectionRecord F001101

    4.5 on-site hours reported

  2. Electric wiring and equipment; installation and maintenance.

    violationRecord 5183924

    30 CFR 77.516

  3. Dust accumulations in surface installations.

    violationRecord 5183923

    30 CFR 77.202 · Significant and substantial (S&S)

  4. Loading and haulage equipment; installations.

    violationRecord 5028445

    30 CFR 77.1605(d)

  5. Machinery and equipment; operation and maintenance.

    violationRecord 5028444

    30 CFR 77.404(a) · Significant and substantial (S&S)

  6. Surface installations; general.

    violationRecord 5028370

    30 CFR 77.200 · Significant and substantial (S&S)

  7. Travelways at surface installations.

    violationRecord 5028369

    30 CFR 77.205(a)

  8. Loading and haulage equipment; installations.

    violationRecord 5028437

    30 CFR 77.1605(k) · $151.00 proposed penalty

  9. Loading and haulage equipment; installations.

    violationRecord 5025975

    30 CFR 77.1605(d) · $151.00 proposed penalty

  10. Loading and haulage equipment; installations.

    violationRecord 5025974

    30 CFR 77.1605(d) · $151.00 proposed penalty

  11. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord 6321647

    3.3 on-site hours reported

  12. Surface installations; general.

    violationRecord 5028342

    30 CFR 77.200 · $151.00 proposed penalty

  13. Storage of materials.

    violationRecord 5028341

    30 CFR 77.208(d) · $151.00 proposed penalty

  14. Machinery and equipment; operation and maintenance.

    violationRecord 5028340

    30 CFR 77.404(a) · Significant and substantial (S&S) · $398.00 proposed penalty

  15. Surface installations; general.

    violationRecord 5028338

    30 CFR 77.200 · $177.00 proposed penalty

  16. Mechanical equipment guards.

    violationRecord 5028333

    30 CFR 77.400(d) · $151.00 proposed penalty

  17. Machinery and equipment; operation and maintenance.

    violationRecord 5028332

    30 CFR 77.404(a) · Significant and substantial (S&S) · $398.00 proposed penalty

  18. Mechanical equipment guards.

    violationRecord 5028331

    30 CFR 77.400(d) · $151.00 proposed penalty

  19. Surface installations; general.

    violationRecord 5028330

    30 CFR 77.200 · $177.00 proposed penalty

  20. Mechanical equipment guards.

    violationRecord 5028329

    30 CFR 77.400(d) · $151.00 proposed penalty

  21. Travelways at surface installations.

    violationRecord 5028328

    30 CFR 77.205(e) · $151.00 proposed penalty

  22. Travelways at surface installations.

    violationRecord 5028321

    30 CFR 77.205(a) · $177.00 proposed penalty

  23. Dust accumulations in surface installations.

    violationRecord 5028320

    30 CFR 77.202 · $151.00 proposed penalty

  24. Electric wiring and equipment; installation and maintenance.

    violationRecord 5028319

    30 CFR 77.516 · $177.00 proposed penalty

  25. Travelways at surface installations.

    violationRecord 5028318

    30 CFR 77.205(a) · Significant and substantial (S&S) · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.