← SOLID ROCK MATERIALS

SOLID ROCK MATERIALS safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F047886

    0.0 on-site hours reported

  2. Compliance Follow-up Inspection

    inspectionRecord F04787F

    1.0 on-site hours reported

  3. Violation — cited standard not reported

    violationRecord 5193213
  4. Violation — cited standard not reported

    violationRecord 5193212
  5. Protection of power conductors from mobile equipment.

    violationRecord 5193211

    30 CFR 56.12005 · $151.00 proposed penalty

  6. Horns and backup alarms.

    violationRecord 5193210

    30 CFR 56.14132(a) · $151.00 proposed penalty

  7. Horns and backup alarms.

    violationRecord 5193209

    30 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty

  8. Berms or guardrails.

    violationRecord 5193208

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F03AB50

    4.5 on-site hours reported

  10. Compliance Follow-up Inspection

    inspectionRecord F03A5F7

    0.8 on-site hours reported

  11. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5064122

    30 CFR 50.30(a) · $151.00 proposed penalty

  12. Regular Safety and Health Inspection

    inspectionRecord F03A5E0

    8.0 on-site hours reported

  13. Examination of working places.

    violationRecord 5064120

    30 CFR 56.18002 · Significant and substantial (S&S) · $4,497.00 proposed penalty

  14. Construction and maintenance of guards.

    violationRecord 5064119

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $16,175.00 proposed penalty

  15. Construction and maintenance of guards.

    violationRecord 5064118

    30 CFR 56.14112(b) · $818.00 proposed penalty

  16. Horns and backup alarms.

    violationRecord 5064117

    30 CFR 56.14132(a) · $165.00 proposed penalty

  17. Roll-over protective structures (ROPS) and seat belts.

    violationRecord 5064116

    30 CFR 56.14130(g) · Significant and substantial (S&S) · $818.00 proposed penalty

  18. Examination of working places.

    violationRecord 5062245

    30 CFR 56.18002 · Significant and substantial (S&S) · $883.00 proposed penalty

  19. Spot Inspection

    inspectionRecord F023102

    5.0 on-site hours reported

  20. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5062244

    30 CFR 50.30(a) · $151.00 proposed penalty

  21. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5062243

    30 CFR 50.30(a) · $151.00 proposed penalty

  22. Regular Safety and Health Inspection

    inspectionRecord F0230FC

    5.0 on-site hours reported

  23. Moving machine parts.

    violationRecord 5062233

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  24. Moving machine parts.

    violationRecord 5062232

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $9,004.00 proposed penalty

  25. Spot Inspection

    inspectionRecord F0230E4

    1.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.