← Soils Incorporated Sand And Gravel

Soils Incorporated Sand And Gravel safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Horns and backup alarms.

    violationRecord 5078264

    30 CFR 56.14132(a) · $151.00 proposed penalty

  2. Identification of power switches.

    violationRecord 5078263

    30 CFR 56.12018 · $151.00 proposed penalty

  3. Inspection of compressed-air receivers and other unfired pressure vessels.

    violationRecord 5078262

    30 CFR 56.13015(a) · $151.00 proposed penalty

  4. Horns and backup alarms.

    violationRecord 5078261

    30 CFR 56.14132(a) · $151.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F035DCE

    18.8 on-site hours reported

  6. Life jackets and belts.

    violationRecord 5078260

    30 CFR 56.15020 · Significant and substantial (S&S) · $366.00 proposed penalty

  7. Safe access.

    violationRecord 5078259

    30 CFR 56.11001 · Significant and substantial (S&S) · $366.00 proposed penalty

  8. Handrails and toeboards.

    violationRecord 5078258

    30 CFR 56.11002 · Significant and substantial (S&S) · $366.00 proposed penalty

  9. Dump site restraints.

    violationRecord 5078257

    30 CFR 56.9301 · Significant and substantial (S&S) · $151.00 proposed penalty

  10. Verbal Hazard Complaint Inspections

    inspectionRecord F0225B8

    7.5 on-site hours reported

  11. New miner training.

    violationRecord 5072270

    30 CFR 46.5(a) · Significant and substantial (S&S) · $517.00 proposed penalty

  12. Notification of commencement of operations and closing of mines.

    violationRecord 5072269

    30 CFR 56.1000 · $151.00 proposed penalty

  13. Notification by operator.

    violationRecord 5072268

    30 CFR 41.11 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.