Shop Br. safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Automatic fire warning devices; actions and response.

    violationRecord 8282120

    30 CFR 75.1103-5(a) · $151.00 proposed penalty

  2. Permissible electric face equipment; maintenance.

    violationRecord 9880123

    30 CFR 75.503 · $151.00 proposed penalty

  3. Roof control plan.

    violationRecord 9880122

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 9880121

    30 CFR 75.503 · $151.00 proposed penalty

  5. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9880120

    30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty

  6. Permissible electric face equipment; maintenance.

    violationRecord 9880119

    30 CFR 75.503 · $151.00 proposed penalty

  7. Protection of trailing cables.

    violationRecord 9880112

    30 CFR 75.606 · Significant and substantial (S&S) · $432.00 proposed penalty

  8. Preshift examination at fixed intervals.

    violationRecord 9880111

    30 CFR 75.360(g) · $151.00 proposed penalty

  9. Verbal Hazard Complaint Inspections

    inspectionRecord F00F678

    3.5 on-site hours reported

  10. Other safeguards.

    violationRecord 9880110

    30 CFR 75.1403

  11. Escapeways; bituminous and lignite mines.

    violationRecord 8282119

    30 CFR 75.380(f)(5)(ii) · $151.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9880109

    30 CFR 75.400 · $151.00 proposed penalty

  13. Maintenance of incombustible content of rock dust.

    violationRecord 9880108

    30 CFR 75.403 · $209.00 proposed penalty

  14. Bath houses and toilet facilities.

    violationRecord 9880107

    30 CFR 75.1712 · $151.00 proposed penalty

  15. Escapeways; bituminous and lignite mines.

    violationRecord 9880106

    30 CFR 75.380(d)(7)(vi) · $336.00 proposed penalty

  16. Mechanical equipment guards.

    violationRecord 9880105

    30 CFR 75.1722(a) · $151.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 9880104

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  18. Roof bolting.

    violationRecord 9880103

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  19. Preshift examination at fixed intervals.

    violationRecord 9880102

    30 CFR 75.360(g) · $151.00 proposed penalty

  20. Maintenance of incombustible content of rock dust.

    violationRecord 9880101

    30 CFR 75.403 · $151.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 8281800

    30 CFR 75.400 · $151.00 proposed penalty

  22. Accumulations of combustible materials.

    violationRecord 9882031

    30 CFR 77.1104 · $151.00 proposed penalty

  23. Mobile equipment; automatic warning devices.

    violationRecord 9880001

    30 CFR 77.410(c) · Significant and substantial (S&S) · $151.00 proposed penalty

  24. Loading and haulage equipment; installations.

    violationRecord 8284900

    30 CFR 77.1605(d) · Significant and substantial (S&S) · $151.00 proposed penalty

  25. Permissible electric face equipment; maintenance.

    violationRecord 9882030

    30 CFR 75.503 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.