← Shoal Creek Mine

Shoal Creek Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5061473

    30 CFR 75.400 · $642.00 proposed penalty

  2. Quantity and location of firefighting equipment.

    violationRecord 5061472

    30 CFR 75.1100-2(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  3. Mechanical equipment guards.

    violationRecord 5061471

    30 CFR 75.1722(c) · $465.00 proposed penalty

  4. Spot Inspections

    inspectionRecord F025C1C

    103(i) · 4.5 on-site hours reported

  5. Escapeways; bituminous and lignite mines.

    violationRecord 5061470

    30 CFR 75.380(d)(7)(iv) · $209.00 proposed penalty

  6. Quantity and location of firefighting equipment.

    violationRecord 5061469

    30 CFR 75.1100-2(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 9827196

    30 CFR 75.512 · $432.00 proposed penalty

  8. Drill dust control at underground areas of underground mines.

    violationRecord 9827195

    30 CFR 72.630(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  9. Escapeway maps.

    violationRecord 9827194

    30 CFR 75.1505(a)(1) · $336.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5061468

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  11. Machinery and equipment; operation and maintenance.

    violationRecord 5061467

    30 CFR 75.1725(c) · Significant and substantial (S&S) · $7,676.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F025C1B

    103(i) · 4.5 on-site hours reported

  13. Quantity and location of firefighting equipment.

    violationRecord 9827193

    30 CFR 75.1100-2(e) · $313.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 9827192

    30 CFR 75.400 · $2,133.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 9827191

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  16. Ventilation controls.

    violationRecord 9827190

    30 CFR 75.333(h) · $366.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 9827189

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  18. Handling of materials

    accidentRecord 220253500029

    Days away from work only

    Accident narrative

    IE was doing normal work duties and felt pain in both shoulders. IE continued to work full duty up until December 5th and missed their first scheduled shift.

  19. Installation of high-voltage transmission cables.

    violationRecord 5061466

    30 CFR 75.807 · $465.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5061465

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 5061464

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F017ABD

    103(i) · 9.0 on-site hours reported

  23. Protection from falls of roof, face and ribs.

    violationRecord 9827188

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  24. Mechanical equipment guards.

    violationRecord 5063441

    30 CFR 77.400(a) · $313.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 9827187

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.