← Shoal Creek Mine

Shoal Creek Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 9700505

    30 CFR 75.400 · $642.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 9700504

    30 CFR 75.400 · $642.00 proposed penalty

  3. Preshift examination at fixed intervals.

    violationRecord 9631272

    30 CFR 75.360(g) · $313.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 9631271

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  5. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9631270

    30 CFR 75.1731(b) · $432.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 9631269

    30 CFR 75.400 · $642.00 proposed penalty

  7. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9631268

    30 CFR 75.1731(b) · $432.00 proposed penalty

  8. Mechanical equipment guards.

    violationRecord 9631267

    30 CFR 75.1722(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9631266

    30 CFR 75.400 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord 6972394

    432.0 on-site hours reported

  11. Spot Inspections

    inspectionRecord F017AC2

    103(i) · 9.0 on-site hours reported

  12. Spot Inspection

    inspectionRecord F025C22

    16.8 on-site hours reported

  13. Condition and examination of firefighting equipment.

    violationRecord 5068827

    30 CFR 75.1100-3 · $313.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 5068826

    30 CFR 75.202(a) · $592.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F025C21

    103(i) · 6.5 on-site hours reported

  16. Roof control plan.

    violationRecord 5061487

    30 CFR 75.220(a)(1) · $1,126.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5061486

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F025C20

    103(i) · 5.5 on-site hours reported

  19. Atmospheric monitoring systems.

    violationRecord 5068825

    30 CFR 75.351(n)(3)(i) · $398.00 proposed penalty

  20. Maintenance of diesel-powered equipment.

    violationRecord 5068824

    30 CFR 75.1914(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  21. Condition and examination of firefighting equipment.

    violationRecord 5068823

    30 CFR 75.1100-3 · $366.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5068822

    30 CFR 75.400 · $755.00 proposed penalty

  23. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5068821

    30 CFR 75.1909(a)(10) · $366.00 proposed penalty

  24. Maintenance of diesel-powered equipment.

    violationRecord 5061485

    30 CFR 75.1914(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5061484

    30 CFR 75.400 · $755.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.