Shoal Creek Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $592.00 proposed penalty
Refuge alternatives.
30 CFR 75.1506(h)(2) · $366.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(i) · $366.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $549.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $504.00 proposed penalty
Spot Inspections
103(i) · 6.5 on-site hours reported
Surface installations; general.
30 CFR 77.200 · $313.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(p) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 77.1109(a) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Powered haulage
Days away from work only
Accident narrative
IE was traveling in the mine and the driver of the EDV cut a corner to close and struck a standing timber in the roadway. The IE's right forearm was struck causing a muscle strain. IE continued to work normal duties until November 13th when they missed the first scheduled shift.
Ventilation controls.
30 CFR 75.333(b)(1) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Spot Inspections
103(i) · 6.5 on-site hours reported
Temporary notations, revisions, and supplements.
30 CFR 75.1202 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $432.00 proposed penalty
Belt air course ventilation.
30 CFR 75.350(b)(8) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Spot Inspections
103(i) · 6.5 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $592.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.