← Shoal Creek Mine

Shoal Creek Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Travelways at surface installations.

    violationRecord 5192027

    30 CFR 77.205(e) · $432.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F024074

    103(i) · 5.0 on-site hours reported

  3. Other safeguards.

    violationRecord 9757546

    30 CFR 75.1403 · $288.00 proposed penalty

  4. Loading and haulage equipment; operation.

    violationRecord 5192432

    30 CFR 77.1607(cc) · $288.00 proposed penalty

  5. Roof control plan.

    violationRecord 5190514

    30 CFR 75.220(a)(1) · $165.00 proposed penalty

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5190513

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5190512

    30 CFR 75.202(a) · $549.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F024073

    103(i) · 5.0 on-site hours reported

  9. Roof Control Technical Investigation

    inspectionRecord 6920873

    42.5 on-site hours reported

  10. Transformers; installation and guarding.

    violationRecord 5192431

    30 CFR 77.509(c) · $959.00 proposed penalty

  11. Accumulations of combustible materials.

    violationRecord 5192430

    30 CFR 77.1104 · $288.00 proposed penalty

  12. Compressed air systems.

    violationRecord 5192429

    30 CFR 77.412(a) · $288.00 proposed penalty

  13. Travelways at surface installations.

    violationRecord 5192428

    30 CFR 77.205(a) · $288.00 proposed penalty

  14. Travelways at surface installations.

    violationRecord 5192427

    30 CFR 77.205(b) · $336.00 proposed penalty

  15. Preshift examination at fixed intervals.

    violationRecord 5068993

    30 CFR 75.360(f) · $288.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F017AE5

    103(i) · 9.0 on-site hours reported

  17. Ventilation controls.

    violationRecord 5068992

    30 CFR 75.333(h) · $336.00 proposed penalty

  18. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5192421

    30 CFR 75.1909(d) · $151.00 proposed penalty

  19. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5192420

    30 CFR 75.1909(a)(10) · $288.00 proposed penalty

  20. Identification check system.

    violationRecord 5192419

    30 CFR 75.1715 · $151.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F017AE4

    103(i) · 9.3 on-site hours reported

  22. Protection from falls of roof, face and ribs.

    violationRecord 5068991

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  23. Roof control plan.

    violationRecord 5068990

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 5068989

    30 CFR 75.400 · $549.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F017AE3

    103(i) · 8.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.