Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $366.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(f)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Verbal Hazard Complaint Inspections
6.0 on-site hours reported
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(4) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Transformers; installation and guarding.
30 CFR 77.509(c) · $959.00 proposed penalty
Inspection and cover plates.
30 CFR 77.512 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $549.00 proposed penalty
Spot Inspections
103(i) · 10.5 on-site hours reported
Preshift examination at fixed intervals.
30 CFR 75.360(b)(11)(ii) · $288.00 proposed penalty
On-shift examination.
30 CFR 75.362(a)(3)(ii) · $959.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $504.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $549.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Warning signs; smoking and open flame.
30 CFR 77.1102 · $959.00 proposed penalty
Ladders; construction; installation and maintenance.
30 CFR 77.206(a) · $288.00 proposed penalty
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $288.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(e) · $1,431.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(c) · $288.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $288.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.