Sherman Hills Quarry safety activity
MSHA violations, accident reports and inspections.
Safety activity
Compliance Follow-up Inspection
0.8 on-site hours reported
Testing grounding systems.
30 CFR 56.12028 · $151.00 proposed penalty
Wall, bank, and slope stability.
30 CFR 56.3130 · Significant and substantial (S&S) · $366.00 proposed penalty
Regular Safety and Health Inspection
12.3 on-site hours reported
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S)
Identification of power switches.
30 CFR 56.12018 · $151.00 proposed penalty
Taglines, hitches, and slings.
30 CFR 56.16007(b) · $151.00 proposed penalty
Other
Injuries due to natural causes
Accident narrative
Somewhere between 12 and 1230, an EE asked EE to clean up the catwalk on the screen deck.� EE was performing EE's normal work at a normal pace. While other EE was tramming the excavator, they noticed EE in distress and responded. EE went into cardiac arrest, 911 was called, CPR started, but EE did not recover.
Non-Chargeable Accident Investigation
3.5 on-site hours reported
Compliance Follow-up Inspection
0.0 on-site hours reported
Regular Safety and Health Inspection
4.0 on-site hours reported
Oxygen cylinder storage.
30 CFR 56.4601 · Significant and substantial (S&S) · $165.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.