  1. Travelways at surface installations.

    violationRecord 5098446

    30 CFR 77.205(e) · Significant and substantial (S&S) · $883.00 proposed penalty

  2. Travelways at surface installations.

    violationRecord 5098445

    30 CFR 77.205(a) · $592.00 proposed penalty

  3. Roof control plan.

    violationRecord 5098442

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $398.00 proposed penalty

  4. Roof control plan.

    violationRecord 5098439

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  5. Automatic fire warning devices; actions and response.

    violationRecord 5098438

    30 CFR 75.1103-5(a) · $151.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5098437

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5098431

    30 CFR 75.202(a) · Significant and substantial (S&S) · $465.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 5098430

    30 CFR 75.503 · $151.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F026033

    66.8 on-site hours reported

  10. Air quality detectors and measurement devices.

    violationRecord 5098429

    30 CFR 75.320(a) · $336.00 proposed penalty

  11. Roof control plan.

    violationRecord 5098428

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  12. Escapeway maps.

    violationRecord 5092077

    30 CFR 75.1505(b) · $151.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5131537

    30 CFR 75.400 · Significant and substantial (S&S) · $465.00 proposed penalty

  14. Rock dusting.

    violationRecord 5131536

    30 CFR 75.402 · $151.00 proposed penalty

  15. Permissible electric face equipment; maintenance.

    violationRecord 5131535

    30 CFR 75.503 · $151.00 proposed penalty

  16. Roof control plan.

    violationRecord 5131534

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  17. Travelways at surface installations.

    violationRecord 5090883

    30 CFR 77.205(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  18. Automatic fire sensors.

    violationRecord 5090882

    30 CFR 75.1103-1(b) · $151.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 5090881

    30 CFR 75.512 · $151.00 proposed penalty

  20. Protection from falls of roof, face and ribs.

    violationRecord 5131533

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  21. Cable fittings; suitability.

    violationRecord 5090880

    30 CFR 75.515 · $209.00 proposed penalty

  22. Escapeways; bituminous and lignite mines.

    violationRecord 5090009

    30 CFR 75.380(d)(7)(v) · $177.00 proposed penalty

  23. Escapeways; bituminous and lignite mines.

    violationRecord 5090008

    30 CFR 75.380(d)(7)(v) · $177.00 proposed penalty

  24. Power wires and cables; insulation and protection.

    violationRecord 5090185

    30 CFR 75.517 · $1,219.00 proposed penalty

  25. Electric equipment; examination, testing, and maintenance.

    violationRecord 5090181

    30 CFR 77.502 · Significant and substantial (S&S) · $818.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.