Sewell Mine B safety activity
MSHA violations, accident reports and inspections.
Safety activity
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $465.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · $697.00 proposed penalty
Regular Safety and Health Inspection
97.3 on-site hours reported
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $697.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
30 CFR 75.1600-2(b) · $209.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(c) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
5.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $592.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $592.00 proposed penalty
Weekly examination.
30 CFR 75.364(b) · $883.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $465.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Cable fittings; suitability.
30 CFR 75.515 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $465.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $267.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $3,448.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $267.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $3,448.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $592.00 proposed penalty
Rock dusting.
30 CFR 75.402 · $2,936.00 proposed penalty
Supplemental examination.
30 CFR 75.361(b) · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.