Safety activity

  1. Condition and examination of firefighting equipment.

    violationRecord 9839789

    30 CFR 75.1100-3 · $151.00 proposed penalty

  2. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9839788

    30 CFR 75.1731(a) · $465.00 proposed penalty

  3. Mechanical equipment guards.

    violationRecord 9839787

    30 CFR 75.1722(a) · $697.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord F020A46

    97.3 on-site hours reported

  5. Condition and examination of firefighting equipment.

    violationRecord 9839786

    30 CFR 75.1100-3 · $151.00 proposed penalty

  6. Escapeway maps.

    violationRecord 9839785

    30 CFR 75.1505(b) · $151.00 proposed penalty

  7. Roof control plan.

    violationRecord 9839784

    30 CFR 75.220(a)(1) · $697.00 proposed penalty

  8. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 9839783

    30 CFR 75.1600-2(b) · $209.00 proposed penalty

  9. Mechanical equipment guards.

    violationRecord 9839782

    30 CFR 75.1722(c) · $151.00 proposed penalty

  10. Verbal Hazard Complaint Inspections

    inspectionRecord F00EB22

    5.5 on-site hours reported

  11. Mine ventilation plan; submission and approval.

    violationRecord 9837899

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5091200

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  13. Weekly examination.

    violationRecord 9837898

    30 CFR 75.364(b) · $883.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 9837897

    30 CFR 75.400 · $465.00 proposed penalty

  15. Power wires and cables; insulation and protection.

    violationRecord 9837896

    30 CFR 75.517 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  16. Cable fittings; suitability.

    violationRecord 9837895

    30 CFR 75.515 · $151.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 9837894

    30 CFR 75.400 · $465.00 proposed penalty

  18. Ventilation controls.

    violationRecord 9837893

    30 CFR 75.333(h) · $267.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9837892

    30 CFR 75.400 · $3,448.00 proposed penalty

  20. Roof control plan.

    violationRecord 9837891

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  21. Roof control plan.

    violationRecord 9837888

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 9837887

    30 CFR 75.400 · $3,448.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 9837886

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  24. Rock dusting.

    violationRecord 9837885

    30 CFR 75.402 · $2,936.00 proposed penalty

  25. Supplemental examination.

    violationRecord 9837884

    30 CFR 75.361(b) · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.