Sewell Mine B safety activity
MSHA violations, accident reports and inspections.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $1,126.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $432.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $193.00 proposed penalty
Rock dusting.
30 CFR 75.402 · $1,037.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $1,126.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $697.00 proposed penalty
Cable fittings; suitability.
30 CFR 75.515 · $193.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $193.00 proposed penalty
Violation — cited standard not reported
$443.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $3,736.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(c) · $288.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(h)
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $193.00 proposed penalty
Ventilation controls.
30 CFR 75.333(e)(1)(ii) · $432.00 proposed penalty
Proximity detection systems.
30 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $1,126.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $6,540.00 proposed penalty
Weekly examination.
30 CFR 75.364(b)(2) · $4,383.00 proposed penalty
Weekly examination.
30 CFR 75.364(b)(1) · $4,383.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(i) · $592.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $2,936.00 proposed penalty
Rock dusting.
30 CFR 75.402 · $818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.