← SEVEN SPRINGS FIELDSTONE

SEVEN SPRINGS FIELDSTONE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F03E22D

    1.3 on-site hours reported

  2. Compliance Follow-up Inspection

    inspectionRecord F03E20D

    0.8 on-site hours reported

  3. Securing gas cylinders.

    violationRecord 4045978

    30 CFR 56.16005 · Significant and substantial (S&S) · $151.00 proposed penalty

  4. Emergency medical assistance and transportation.

    violationRecord 4045977

    30 CFR 56.18014 · $151.00 proposed penalty

  5. New miner training.

    violationRecord 4045976

    30 CFR 46.5(a) · Significant and substantial (S&S) · $407.00 proposed penalty

  6. Firefighting, evacuation, and rescue procedures.

    violationRecord 4045974

    30 CFR 56.4330

  7. First-aid materials.

    violationRecord 4045973

    30 CFR 56.15001

  8. Requirement for a HazCom program.

    violationRecord 2805340

    30 CFR 47.31(a)

  9. Toilet facilities.

    violationRecord 2805339

    30 CFR 56.20008

  10. Roadway maintenance.

    violationRecord 2805338

    30 CFR 56.9313

  11. Safety defects; examination, correction and records.

    violationRecord 2805337

    30 CFR 56.14100(b)

  12. Safe access.

    violationRecord 2805336

    30 CFR 56.11001

  13. Safety defects; examination, correction and records.

    violationRecord 2805335

    30 CFR 56.14100(b)

  14. Operators stations.

    violationRecord 2805334

    30 CFR 56.14103(b)

  15. Safety defects; examination, correction and records.

    violationRecord 2805333

    30 CFR 56.14100(c)

  16. Emergency medical assistance and transportation.

    violationRecord 2805332

    30 CFR 56.18014 · $151.00 proposed penalty

  17. Violation — cited standard not reported

    violationRecord 2805331

    $168.00 proposed penalty

  18. Toilet facilities.

    violationRecord 9888033

    30 CFR 56.20008 · $168.00 proposed penalty

  19. Roadway maintenance.

    violationRecord 9888032

    30 CFR 56.9313 · Significant and substantial (S&S) · $184.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 9888031

    30 CFR 56.14100(b) · Significant and substantial (S&S) · $168.00 proposed penalty

  21. Safe access.

    violationRecord 5081474

    30 CFR 56.11001 · Significant and substantial (S&S) · $168.00 proposed penalty

  22. Safety defects; examination, correction and records.

    violationRecord 5081473

    30 CFR 56.14100(b) · Significant and substantial (S&S) · $168.00 proposed penalty

  23. Operators stations.

    violationRecord 5081472

    30 CFR 56.14103(b) · Significant and substantial (S&S) · $168.00 proposed penalty

  24. Safety defects; examination, correction and records.

    violationRecord 5081471

    30 CFR 56.14100(c) · Significant and substantial (S&S) · $184.00 proposed penalty

  25. New miner training.

    violationRecord 2805325

    30 CFR 46.5(a) · Significant and substantial (S&S) · $443.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.