Safety activity
Spot Inspection
2.5 on-site hours reported
Spot Inspection
1.5 on-site hours reported
Regular Safety and Health Inspection
4.5 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $959.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $883.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(c) · Significant and substantial (S&S) · $432.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $432.00 proposed penalty
Protection of trailing cables.
30 CFR 75.606 · Significant and substantial (S&S) · $959.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $432.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Deenergization of self-propelled electric face equipment; performance requirements.
30 CFR 75.523-2(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400
Accumulation of combustible materials.
30 CFR 75.400 · $320.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(c) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $398.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.