← Saragosa Rock

Saragosa Rock safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord 6937593

    4.3 on-site hours reported

  2. Safety can use.

    violationRecord 5250433

    30 CFR 56.4402

  3. Safety defects; examination, correction and records.

    violationRecord 5170247

    30 CFR 56.14100(b) · $398.00 proposed penalty

  4. Grounding transformer and switchgear enclosures.

    violationRecord 5170246

    30 CFR 56.12026 · $883.00 proposed penalty

  5. Housekeeping.

    violationRecord 5170244

    30 CFR 56.20003(a) · $267.00 proposed penalty

  6. Housekeeping.

    violationRecord 5170243

    30 CFR 56.20003(a) · $267.00 proposed penalty

  7. Insulation and fittings for power wires and cables.

    violationRecord 5170242

    30 CFR 56.12008 · $883.00 proposed penalty

  8. Regular Safety and Health Inspection

    inspectionRecord F017E0D

    9.5 on-site hours reported

  9. Regular Safety and Health Inspection

    inspectionRecord F01AF1C

    8.8 on-site hours reported

  10. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5001562

    30 CFR 50.30(a) · $151.00 proposed penalty

  11. Housekeeping.

    violationRecord 5001561

    30 CFR 56.20003(a) · $151.00 proposed penalty

  12. Electrical conductors.

    violationRecord 5001560

    30 CFR 56.12004 · $151.00 proposed penalty

  13. Protection for openings around travelways.

    violationRecord 5001559

    30 CFR 56.11012 · $151.00 proposed penalty

  14. Electrical conductors.

    violationRecord 5001558

    30 CFR 56.12004 · $151.00 proposed penalty

  15. Berms or guardrails.

    violationRecord 5001557

    30 CFR 56.9300(a) · $151.00 proposed penalty

  16. Changes; notification by operator.

    violationRecord 9686697

    30 CFR 41.12 · $151.00 proposed penalty

  17. Requirement for a HazCom program.

    violationRecord 9686696

    30 CFR 47.31(a) · $151.00 proposed penalty

  18. Moving machine parts.

    violationRecord 9686695

    30 CFR 56.14107 · Significant and substantial (S&S) · $245.00 proposed penalty

  19. Construction and maintenance of guards.

    violationRecord 9686694

    30 CFR 56.14112(b) · $151.00 proposed penalty

  20. Securing gas cylinders.

    violationRecord 9686693

    30 CFR 56.16005 · $151.00 proposed penalty

  21. Barricades and warning signs.

    violationRecord 9686692

    30 CFR 56.20011 · $151.00 proposed penalty

  22. Regular Safety and Health Inspection

    inspectionRecord F011F11

    11.8 on-site hours reported

  23. Machinery

    accidentRecord 220250770003

    No dys awy frm wrk,no rstr act

    Accident narrative

    While attempting to tighten down a bolt with a washer the Employee failed to use a tool in a rush to secure the nut down to the bolt, the Employee used a half inch battery powered impact gun using EE's left hand while trying to hold a washer with EE's right hand run the nut up and caught EE's right index finger while wearing EE's gloves.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.