Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F029853

    1.0 on-site hours reported

  2. Safety defects; examination, correction and records.

    violationRecord 5174060

    30 CFR 56.14100(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  3. Examination of working places.

    violationRecord 5174059

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  4. Requirements for written safety program.

    violationRecord 5174058

    30 CFR 56.23003(b) · $151.00 proposed penalty

  5. Training plans.

    violationRecord 5174057

    30 CFR 46.3(b)(2) · $151.00 proposed penalty

  6. Horns and backup alarms.

    violationRecord 5174056

    30 CFR 56.14132(a) · $549.00 proposed penalty

  7. Horns and backup alarms.

    violationRecord 5174055

    30 CFR 56.14132(a) · $1,818.00 proposed penalty

  8. Safety defects; examination, correction and records.

    violationRecord 5174054

    30 CFR 56.14100(b) · $549.00 proposed penalty

  9. Operators stations.

    violationRecord 5174053

    30 CFR 56.14103(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  10. Construction and maintenance of guards.

    violationRecord 5174052

    30 CFR 56.14112(b) · $818.00 proposed penalty

  11. Construction and maintenance of guards.

    violationRecord 5174051

    30 CFR 56.14112(b) · $818.00 proposed penalty

  12. Moving machine parts.

    violationRecord 5174050

    30 CFR 56.14107(a) · $818.00 proposed penalty

  13. Construction and maintenance of guards.

    violationRecord 5174049

    30 CFR 56.14112(a)(1) · $818.00 proposed penalty

  14. Moving machine parts.

    violationRecord 5174048

    30 CFR 56.14107(a) · $818.00 proposed penalty

  15. Insulation and fittings for power wires and cables.

    violationRecord 5174047

    30 CFR 56.12008 · $165.00 proposed penalty

  16. Berms or guardrails.

    violationRecord 5174046

    30 CFR 56.9300(b) · $165.00 proposed penalty

  17. Moving machine parts.

    violationRecord 5174045

    30 CFR 56.14107(a) · $818.00 proposed penalty

  18. Dust control.

    violationRecord 5174044

    30 CFR 56.9315 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord F029852

    13.5 on-site hours reported

  20. Compliance Follow-up Inspection

    inspectionRecord 6934374

    0.5 on-site hours reported

  21. Regular Safety and Health Inspection

    inspectionRecord 6934367

    5.0 on-site hours reported

  22. Examination of working places.

    violationRecord 9678778

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $366.00 proposed penalty

  23. First-aid materials.

    violationRecord 9678777

    30 CFR 56.15001 · $151.00 proposed penalty

  24. Horns and backup alarms.

    violationRecord 9678776

    30 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty

  25. Safety defects; examination, correction and records.

    violationRecord 9678775

    30 CFR 56.14100(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.